《CEM_Time-Cost-Quality Trade-Off Analysis for Highway Construction》.pdf

《CEM_Time-Cost-Quality Trade-Off Analysis for Highway Construction》.pdf

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《CEM_Time-Cost-Quality Trade-Off Analysis for Highway Construction》.pdf

Time-Cost-Quality Trade-Off Analysis for Highway Construction Khaled El-Rayes, M.ASCE,1 and Amr Kandil, A.M.ASCE2 Abstract: Many departments of transportation have recently started to utilize innovative contracting methods that provide new incentives for improving construction quality. These emerging contracts place an increasing pressure on decision makers in the construction industry to search for an optimal resource utilization plan that minimizes construction cost and time while maximizing its quality. This paper presents a multiobjective optimization model that supports decision makers in performing this challenging task. The model is designed to transform the traditional two-dimensional time-cost tradeoff analysis to an advanced three-dimensional time-cost-quality trade-off analy- sis. The model is developed as a multiobjective genetic algorithm to provide the capability of quantifying and considering quality in construction optimization. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating and visualizing optimal tradeoffs among construction time, cost, and quality. DOI: 10.1061/ASCE0733131:4477 CE Database subject headings: Information technology IT; Algorithms; Highway construction; Cost control; Contracts; Construction industry. Introduction reduce construction duration Jaraiedi et al. 1995; 3 nighttime construction that seeks to cut service disruption and project time Existing networks of highways and roads are aging and deterio- by requiring contractors to work during off-peak nighttime h

文档评论(0)

wgvi + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档