石安河第三泵站初步设计受.pdfVIP

  • 5
  • 0
  • 约13.75万字
  • 约 116页
  • 2015-11-09 发布于湖北
  • 举报
石安河第三泵站初步设计受.pdf

3 8m /s 8.6m 9.5 900HLB-10 2 n 590 r/min YSL5005-10 280kW 4 Abstract supplement irrigation water to south through the main, while meeting the irrigation, drainage, industrial and agricultural production, shipping and transportation requirements of peoples living water, according to transfer function of the pumping station, decided in the new, between the old and the construction of the canal pass through Young Nanhe The third pumping station. The pump station design flow of 8 m3 / s, design head 8.6m, the maximum head 9.5m. Use 900HLB-10 Vertical axial flow pump (blade angle, speed r / min), with YSL5002-12 type 280kW electric motor 4 sets. Pier station house wet room wall structure, the main buildings, including pumping station, pier, into the pool, a pool, the back wall, the main plant, vice plant and so on. The construction of the pumping station, irrigation and drought would play an important role in flood control and drainage. This paper is the first station through Nanhe the preliminary design report, including the selection of pumps, auxiliary equipment selection, the main building design, stability analysis, structure calculation. Key Words: irrigation drainage flow head structure type selection stability analysis stress analysis

文档评论(0)

1亿VIP精品文档

相关文档