网站大量收购闲置独家精品文档,联系QQ:2885784924

巴基斯坦大件设备吊装方案.doc

  1. 1、本文档共44页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
OGDCL PROJECT KPD – TAY Integrated Development Project Phase-II PROC-FC/CB/PROJ-667/767321/2013 DESIGN, MANUFACTURING, SUPPLY, INSTALLATION, CONSTRUCTION COMMISSIONING OF AMINE SWEETENING, LPG CONDENSATE STABILIZATION UNITS, POWER GENERATION PACKAGE, SALES GAS METERING SKID, HOT OIL SYSTEM AND OTHER RELATED UTILITIES CONTENTS 1. Basis of Preparation 1 2. Overview of the Project 1 3. The conditions available before lifting 3 4. Technical Preparation and Calculation 4 4.1. Crane Preparation and Calculation 4 4.2. Slings Preparation and Calculation 5 4.3. Spreader Beam Preparation and Calculation 7 4.4. Layout and Leveling for Site Lifting 11 4.5. Foundation Treatment 12 4.6. Foundation Treatment and Acceptance 14 4.7. Equipment Entering the Site 15 4.8. Checking Lifting Eye 15 4.9. Equipment Anchor Bolt Treatment and Sizing Block Placing 16 5. The Entry Route for Heavy Cranes and Heavy Equipments 18 6. Cranes’ Layout after Entering the Site 19 7. Lifting Schedule and Sequence 24 8. Equipment Lifting 24 9. Secondary Crane Lifting Weight 29 10. Loosen Slings and Equipment Unhook 30 11. Equipment Installation Methods and Technical Requirements 30 12. Organization Chart for Quality and Safety Assurance 32 13. Table 13 for construction machines, tools and auxiliary materials 35 14. Table 14 for staff plan 37 Attached: The Load Chart for 250 ton Crane and 600 ton Crane The Risk Analysis of Heavy Duty Equipments Hoisting and Its Precautions Basis of Preparation Equipment Layout Plan and Equipment Assembly Drawings for Gas Processing Facility Proj-667 Pakistan Lifting Manual Load Charts for Cranes GB50231-2009 GB150-2011 Overview of the Project Project Features The heavy equipments of the project are mainly focused on Package AB with a close layout, a narrow placing space and a high altitude. There are pipe racks, skids, other equipment and structure foundation around the columns. Lifting radius is large so a small crane is unable to meet the requirements of instal

文档评论(0)

企管文库 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档