- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Section07263-AirBarrierAssociationofAmerica.doc
SECTION 07263
SPRAY POLYURETHANE FOAM INSULATING AIR BARRIER SYSTEM
GENERAL
SECTION INCLUDES
A. This Section specifies a spray polyurethane foam ( SPF ) air barrier in exterior wall assemblies.
SPEC NOTE: COORDINATE RELATED WORK REQUIREMENTS WITH CONTENTS OF REFERENCED SPECIFICATION SECTIONS. Surfaces to receive sprayfoam, should be free from dirt, release agents, etc. (paint ready)
B. Related Work in other Sections includes the following:
Section 01400 - Quality Requirements; coordination with Owner’s independent testing and inspection agency.
Section 01450 - Mock-Ups; exterior wall mock-ups.
Section 01500 - Temporary Facilities and Controls; requirement to schedule work to prevent sunlight and weather exposure of materials beyond limits established by manufacturer; requirement to protect materials from damage after installation and prior to installation of enclosing work.
Section 03300 – Cast-In-Place Concrete; requirement that backup concrete be free of fins, protrusions and large holes.
Section 04200 – Unit Masonry; requirement that backup masonry joints are flush and completely filled with mortar, and that excess mortar on brick ties will be removed; requirement for gap at deflection joints and fillers; coordination with sequencing of through-wall flashing.
Section 07500 - Membrane Roofing; requirement for coordination with sequencing of membrane roofing; requirement to seal roof membrane to wall air and vapor barrier.
Section 09253 – Sheathing; requirement that backup gypsum sheathing has been installed with significantly damaged areas repaired as acceptable to the air manufacturer; requirement for gap at deflection joints and fillers.
PERFORMANCE REQUIREMENTS
A. Material Performance: Provide materials which have an air permeance not to exceed 0.004 cubic feet per minute per square foot under a pressure differential of 0.3 in. water (1.57 psf) (0.02 L/m2 @ 75 Pa.) when tested according to ASTM E 2178.
B. System Performance. Substantiate that air barrier m
您可能关注的文档
- ReinforcedConcrete-WSD-Open.Michigan-Universityof.ppt
- RelationalAlgebra-DepartmentofComputerScience.ppt
- RelationalAlgebra-ProgramsinMathematicsand.ppt
- RelationalAlgebra.ppt
- RelationalAlgebraandCalculus.ppt
- RelationalAlgebraLearningOutcomes-Departmentof.ppt
- RelationalAlgebraSlides.ppt
- RelationalCalculus.ppt
- RelationshipBetweenBasicOperationofBooleanand.ppt
- RemovalandInstallationofthe1600iEngine.doc
- 市政协社情民意特邀信息员培训班领导讲话-领导讲话模板.doc
- 市肿瘤医院2011年党建工作总结.doc
- 2025年医德医风七个方面问题查摆问题清单.docx
- 国企2025年作风建设总结大会主持词+作风建设总结会议上的讲话.docx
- 关于集团公司党委2025年前三季度落实全面从严治党主体责任情况的报告+全面从严治党主体责任清单.docx
- 2025年关于在“学精神、强作风、促攻坚”大讨论中的学习心得体会.docx
- 省生态环境厅“树牢正确政绩观”专题学习会上的交流发言+在生态环境系统突出问题大整改视频会议上的讲话.docx
- 2025年省委十二届九次全精神党课讲稿辅导报告.docx
- 关于国有企业党委、税务局2025年党风廉政建设专题教育活动总结报告.docx
- 在关于深化作风建设暨落实“回头看”工作部署会议上的讲话+学习教育总结专题会上的讲话+常态化长效化研讨材料.docx
最近下载
- 《乡土中国》之(1):乡土本色.doc.docx VIP
- Q-JL J130006-2019-加速模拟大气腐蚀试验方法.pdf VIP
- 2.0m光伏支架桩基计算(1).xlsx VIP
- 广东省汕头市潮阳区潮阳实验学校2025-2026学年高二上学期9月月考语文试卷.docx VIP
- 基孔肯雅热预防防蚊灭蚊保护自身和家人健康科普课件PPT.pptx VIP
- 第一章第二节《外国绘画艺术》(教案)中职美术《艺术美术鉴赏与实践》同步精品(高教版(2023)(修订版)).docx VIP
- 2026中国农业银行广西壮族自治区分行校园招聘666人笔试备考试题及答案解析.docx
- 入党志愿书电子表格[2013年版A4].doc VIP
- 药品说明书:硫糖铝片说明书.docx VIP
- 起重作业安全知识培训课件.pptx VIP
文档评论(0)