1-NationalParkService.doc

  1. 1、本文档共169页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1-NationalParkService.doc

A Protocol for Monitoring Estuarine Nutrient Enrichment in Coastal Parks of the National Park Service Northeast Region Blaine S. Kopp and Hilary A. Neckles USGS Patuxent Wildlife Research Center 196 Whitten Road Augusta, ME 04330 207-622-8201 bkopp@ hilary_neckles@ April 23, 2007 Submitted To: National Park Service Northeast Coastal and Barrier Network TABLE OF CONTENTS 1 PROTOCOL NARRATIVE 1 1.1 Background and Objectives 1 1.1.1 Introduction 1 1.1.2 Monitoring Objectives 3 1.1.3 Development of the Monitoring Protocol 3 1.1.4 Vulnerability to Nutrient Over-Enrichment 5 1.1.5 Rationale for Vital Sign Selection 10 Estuarine Water Chemistry 10 Estuarine Water Quality 11 Estuarine Water Clarity 12 Estuarine Sediment Organic Carbon 12 Seagrass Distribution 13 Seagrass Condition 13 1.2 Sampling Designs and Target Populations 15 1.2.1 Seagrass Distribution 15 1.2.2 Seagrass Condition 15 1.2.3 Estuarine Water Chemistry, Water Quality, Water Clarity, and Sediment Organic Carbon 16 Background and Temporal Target Populations 16 Spatial Target Populations 17 Spatial Sampling Design 18 Trend Stations 20 Continuous Monitoring Stations 20 Individual Park Designs 21 1.3 Field Methods 53 1.3.1 Field Schedule and Preparations 53 1.3.2 Sampling Methods 53 1.4 Data Management, Analysis and Reporting 54 1.4.1 Water Quality, Water Clarity, Water Chemistry and Sediment Organic Carbon 54 1.4.2 Seagrass Condition 55 1.4.3 Seagrass Distribution 55 1.4.4 Clean Water Act 56 1.5 Revising the Protocol 56 1.6 Personnel and Operational Requirements 57 1.6.1 Staffing models for water quality monitoring 57 1.6.2 Annual Workload and Field Schedule 58 1.6.3 Personnel Training 61 1.6.4 Equipment Needs and Startup Costs 62 1.7 References 64 2 STANDARD OPERATING PROCEDURES (SOPs) 73 2.1 SOP 1 – Field Season Logistics 2.1-1 2.1.1 Safety Training 2.1-1 2.1.2 Protocol Methods Training 2.1-1 2.1.3 Field Season Preparation 2.1-2 2.1.4 Field logistics 2.1-3 2.2 SOP 2 – Preparation of the Loggin

文档评论(0)

***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档