* 13 Speaker Notes ; 1. ?? ??? ??/???? ????? ??? 2. Sub ass’y, ? bulky ??? ??/?? The direct run method is where on truck goes to a single supplier and returns to the plant with a full load. It is important to note that windows of time are set at the supplier and at the plant. Many of the sequenced sub-assemblies will arrive in this manner from the Tier I Supplier. By the way all suppliers to the LGR Plant will be tier one. Ask: Does anybody have any idea why we would want to standardize the delivery times of full load direct runs? Answer: The rationale is the same as the small lot and
您可能关注的文档
- 公文写作培训课件要点.ppt
- 公务员报考热原因剖析要点.doc
- 公务员面试完全攻略要点.doc
- 公务员知识竞赛题选题器现场答题器要点.ppt
- 公寓楼外墙涂料项目施工组织设计要点.doc
- 公园改造景观工程施工组织设计要点.doc
- 公园改造施工组织设计要点.doc
- 公园路新沂市城市供水管网工程要点.doc
- 公允价值核算投资性房地产的应用研究以中航地产为例要点.doc
- 公租房工程质量管理制度要点.doc
- 50万吨汽油调和技改项目环评报告书.pdf
- 河北省文安县第一中学2025-2026学年高一上学期10月月考英语试题(解析版).docx
- 河南省TOP二十校205—2026学年高一上学期10月联考生物试题(原卷版).docx
- 河南省安阳市第一中学、鹤壁市高中、新乡市第一中学三校2025-2026学年高一上学期第一次联考数学试题(解析版).docx
- 河南省部分高中2025-2026学年高一上学期第二次月考数学试卷(解析版).docx
- 河南省百师联盟2025-2026学年高二10月联考数学试题(北师大版)(解析版).docx
- 河南省部分学校2025-2026学年高一上学期期中考试数学试题(解析版).docx
- 河南省部分重点中学2025~2026学年高二上学期10月末质量检测数学试题(解析版).docx
- 河南省部分重点中学2025-2026学年高二上学期10月末质量检测英语试题(解析版).docx
- 桥梁伸缩缝安装工艺(可编辑).pptx
原创力文档

文档评论(0)