- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
历届航海英语真题大副902(25--48)
PAGE
PAGE 82
25902已审
1. The declaration made by the shipper, if embodied in the bill of lading, is ______ evidence, but is not binding or conclusive on the carrier.
A.absolute B.important C.decisive D.prima facie
2. Before welding can be done in a tank that has previously carried petroleum products, a certificate must be obtained from ________ .
A.the customs B.the Register Bureau of shipping
C.the shipyard fire department D.a certified gas chemist
3. The dew point of the air in the ships hold is to:IBe kept below the temperature of the cargo to prevent cargo sweat.II.Be kept above the temperature of the hull and bulkheads to prevent ships sweat.
A.Ⅰ only B.II only C.Both Ⅰand II D.Neither Ⅰ nor II
4. MV CASABIANCA ordered the MV RADIANT MED to wait for her and the MV RADIANT MED acknowledged the message stating that speed was being reduced as far as possible. This sentence says that ________ .
A.MV RADIANT MED was told by MV CASABIANCA to reduce her speed
B.MV CASABIANCA was told by MV RADIANT MED to reduce her speed
C.MV CASABIANCA was reducing her speed but she could not wait for MV RADIANT MED
D.MV RADIANT MED was reducing her speed but she could not wait for MV CASABIANCA
5. The Chief and 3rd Engineers went below, changed the fuel to diesel oil and reduced the engine to slow ahead.This sentence implies all those below except that _______.
A.the Engine was not on slow ahead before Chief and 3rd Engineers went down
B.the Engine was using diesel oil before Chief and 3rd Engineers went down
C.the Engine was using fuel oil before Chief and 3rd Engineers went down
D.the Chief and 3rd Engineers went into the Engine Room to operate the Engine
6. The tentative cargo plan ________.
A.eliminates confusion with the final stowage plan
B.shows the approximate amount of cargo to be loaded in each hold
C.expedites the total operation
D.requires a
您可能关注的文档
最近下载
- 装修监理规划范本样本.doc VIP
- 中国共产党历史1921-2021(广州大学)学习通网课章节测试答案.docx VIP
- 江苏和鼎网架钢结构工程有限责任公司钢结构桁架吊装安装专项施工方案.doc VIP
- 装饰装修工程监理细则装饰装修工程监理细则.doc VIP
- 年产40万平石墨烯散热膜项目环评(新版环评)环境影响报告表.pdf VIP
- 氧化石墨烯制备关键技术成果转化项目环评资料环境影响.docx VIP
- 2025年风电场产业现状与发展前景趋势.docx VIP
- 二年级数学上册应用题专项练习(每日一练,共34份).pdf VIP
- 道路交通标志和标线 第3部分:道路交通标线.pdf VIP
- 数据要素白皮书(2024年).pdf VIP
原创力文档


文档评论(0)