历届航海英语真题大副902(25--48).docVIP

  • 18
  • 0
  • 约33.32万字
  • 约 82页
  • 2017-10-06 发布于山西
  • 举报
历届航海英语真题大副902(25--48)

PAGE  PAGE 82 25902已审 1. The declaration made by the shipper, if embodied in the bill of lading, is ______ evidence, but is not binding or conclusive on the carrier. A.absolute B.important C.decisive D.prima facie 2. Before welding can be done in a tank that has previously carried petroleum products, a certificate must be obtained from ________ . A.the customs B.the Register Bureau of shipping C.the shipyard fire department D.a certified gas chemist 3. The dew point of the air in the ships hold is to:IBe kept below the temperature of the cargo to prevent cargo sweat.II.Be kept above the temperature of the hull and bulkheads to prevent ships sweat. A.Ⅰ only B.II only C.Both Ⅰand II D.Neither Ⅰ nor II 4. MV CASABIANCA ordered the MV RADIANT MED to wait for her and the MV RADIANT MED acknowledged the message stating that speed was being reduced as far as possible. This sentence says that ________ . A.MV RADIANT MED was told by MV CASABIANCA to reduce her speed B.MV CASABIANCA was told by MV RADIANT MED to reduce her speed C.MV CASABIANCA was reducing her speed but she could not wait for MV RADIANT MED D.MV RADIANT MED was reducing her speed but she could not wait for MV CASABIANCA 5. The Chief and 3rd Engineers went below, changed the fuel to diesel oil and reduced the engine to slow ahead.This sentence implies all those below except that _______. A.the Engine was not on slow ahead before Chief and 3rd Engineers went down B.the Engine was using diesel oil before Chief and 3rd Engineers went down C.the Engine was using fuel oil before Chief and 3rd Engineers went down D.the Chief and 3rd Engineers went into the Engine Room to operate the Engine 6. The tentative cargo plan ________. A.eliminates confusion with the final stowage plan B.shows the approximate amount of cargo to be loaded in each hold C.expedites the total operation D.requires a

文档评论(0)

1亿VIP精品文档

相关文档