Chapter 7
3.(1) Program-controlled I/O: All control is directly under the control of the program, so changes can be readily implemented. The order in which devices are serviced is determined by the program, this order is not necessarily fixed but can be altered by the program, as necessary. It is relatively easy to add or delete devices. But a great deal of time may be spent on testing the status inputs of the I/O devices, when the devices do not need servicing.
(2) Interrupt-controlled I/O: It is accomplished by having the I/O device generate an interrupt signal which is tested directly by th
您可能关注的文档
- 停车场反向查询系统解析.doc
- 网上论坛管理系统的设计与实现解析.doc
- 网上人大管理学原理作业答案解析.doc
- 网上认证4.3.61安装及使用说明解析.doc
- 停车场管理方案解析.doc
- 网上认证系统操作说明解析.doc
- 网上商城招商方案解析.doc
- 停车场管理系统无人值守车牌识别方案解析.doc
- 网上书城项目计划书解析.doc
- 停车场计数器的设计解析.doc
- 中国国家标准 GB/T 48336.304-2026星闪无线通信系统 第304部分:基础服务层 5G蜂窝网络融合.pdf
- CCAA《管理体系认证基础》第2版+三色笔记office完整版-2026.docx
- RCS-901系列超高压线路成套保护装置技术和使用说明书.pdf
- RCS-902A(B.C.D)型超高压线路成套保护装置技术说明书.pdf
- PCS-923A断路器失灵起动及辅助保护测控装置技术使用说明书.pdf
- RCS-924A型T区保护装置技术和使用说明书.pdf
- GB/T 48349.3-2026信息技术 数字视网膜系统 第3部分:端子系统.pdf
- 中国国家标准 GB/T 48349.3-2026信息技术 数字视网膜系统 第3部分:端子系统.pdf
- 《GB/T 48349.3-2026信息技术 数字视网膜系统 第3部分:端子系统》.pdf
- 中国国家标准 GB/T 48355-2026石化化工用软起动装置.pdf
原创力文档

文档评论(0)