- 1、本文档共50页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* The goal if to have no more than 4-5 F temperature variation within 1 hr. Repeated variations of temperature of 4-5 F within short periods of time result in reduction in gain and increased opportunities for health challenges. However, gradual changes in temperature (such as cooling down 6-10 F at night and heating to recommended temperature beginning at 6-7 am) have been demonstrated to actually increase feed intake and daily gain if these begin 1 week after weaning. * * Typical dimensions of a tunnel room/barn. * An example of how tunnel barns are designed. Use the larger of the 2 values. * Example of why there is a minimum size to a tunnel barn. If there is an 8 ft ceiling, to get 300 fpm for a 41 ft wide barn, you need a minimum of 96,00 CFM regardless of the number of pigs. For a 1000 hd barn, you need 120,000 CFM to meet the 120 CFM design criteria for temperature removal. For a 1000 hd barn, the cross sectional velocity is 375 ft/min. If you had 1200 pigs in a 41 ft wide barn, the cross sectional velocity would go up to 450 ft/min at 120 cfm/pig. This illustrates why there is an upper limit to length (pig numbers per room) with tunnel ventilation. * Example of why there is a minimum size to a tunnel barn. If there is an 8 ft ceiling, to get 300 fpm for a 41 ft wide barn, you need a minimum of 96,00 CFM regardless of the number of pigs. For a 1000 hd barn, you need 120,000 CFM to meet the 120 CFM design criteria for temperature removal. For a 1000 hd barn, the cross sectional velocity is 375 ft/min. If you had 1200 pigs in a 41 ft wide barn, the cross sectional velocity would go up to 450 ft/min at 120 cfm/pig. This illustrates why there is an upper limit to length (pig numbers per room) with tunnel ventilation. * * * * * * * * * * * Fans tilted downward 15 degrees. Note that fans blow across the building (S to N). Idea is to force hot air out of building (N side) on calm days. Downward tilt increases air flow in pig zone. Note also the low stem wall – a
您可能关注的文档
- 路面试验全套(十一月收集整理)要点.ppt
- 路面试验全套要点.ppt
- 麓山国际社区最详细版个案(中)要点.ppt
- 露天矿山常见安全隐患的排查与处置要点.ppt
- 露天矿山隐患排查处理要点.ppt
- 轮机工程前沿技术要点.ppt
- 螺杆压缩机要点.ppt
- 落实《隧道施工安全九条规定》宣贯(2014.11.25)要点.ppt
- 旅游地质学要点.ppt
- 旅游景区开发与管理第六章要点.ppt
- 2025年福马集团校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版附答案.docx
- 2025年福耀玻璃工业集团股份有限公司校园招聘模拟试题附带答案详解附答案.docx
- 2025年福马集团校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版完美版.docx
- 2025年福耀玻璃工业集团股份有限公司校园招聘模拟试题附带答案详解学生专用.docx
- 2025年福耀玻璃工业集团股份有限公司校园招聘模拟试题附带答案详解参考答案.docx
- 2025年福耀玻璃工业集团股份有限公司校园招聘模拟试题附带答案详解完美版.docx
- 2025年科瑞集团有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版学生专.docx
- 2025年福马集团校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版推荐.docx
- 2025年福马集团校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案详解版审定版.docx
- 2025年福耀玻璃工业集团股份有限公司校园招聘85人公开引进高层次人才和急需紧缺人才笔试参考题库答案.docx
最近下载
- 船外机_本田维修手册BF175BF200BF225中文版.pdf VIP
- 船外机_雅马哈维修手册_英文F225F_Fl225F_F250D_Fl250D_F300B_Fl300B_p1-a-p150-anglais-Service Manual-.pdf VIP
- 船外机_雅马哈维修手册_英文F6AMH_6BMH_6Y_8CMH_8CW_8Y Service Manual [en].pdf VIP
- 船外机_雅马哈维修手册_英文F4B-F5A-F6C-(6BV-28197-3M-11)Service Manual-2014.pdf VIP
- 船外机_雅马哈维修手册_英文F9.9-T9.9(LIT-18616-03-03 6AU-28197-1K-11)2007Service Manual.pdf VIP
- 船外机_雅马哈F20C(6AJ-28197-5K-11)英文维修手册.pdf VIP
- 小儿急性咽炎护理查房.pptx
- 乐山市公安局警务辅助人员招聘考试真题2024.docx VIP
- 船外机_雅马哈维修手册_英文F15C-F20B-F20bmh-2006.pdf VIP
- 船外机_雅马哈F9.9JMH(6DR-28197-3S-11)英文维修手册.pdf VIP
文档评论(0)