- 1
- 0
- 约9.93万字
- 约 2页
- 2017-05-04 发布于贵州
- 举报
优秀内科实习小结_0
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 企业财务科科长竞聘演讲稿.doc
- 企业财务管理实习报告格式.doc
- 企业财务管理实习报告范文.doc
- 企业财务部年度工作总结1000字.doc
- 企业趣味活动方案2014.doc
- 企业趣味活动策划方案.doc
- 企业运动会的致辞.doc
- 企业部门2016年个人总结.doc
- 企业部门2016年工作总结.doc
- 企业部门经理的英文简历模板大全.doc
- 中国国家标准 GB/T 6675.9-2025玩具安全 第9部分:化学及类似活动的实验玩具.pdf
- 《GB/T 6675.9-2025玩具安全 第9部分:化学及类似活动的实验玩具》.pdf
- GB/T 46975-2025婴童用品 便携式婴儿睡篮技术要求.pdf
- 中国国家标准 GB/T 46975-2025婴童用品 便携式婴儿睡篮技术要求.pdf
- 《GB/T 46975-2025婴童用品 便携式婴儿睡篮技术要求》.pdf
- 《GB/T 6675.14-2025玩具安全 第14部分:指画颜料要求和测试方法》.pdf
- GB/T 6675.14-2025玩具安全 第14部分:指画颜料要求和测试方法.pdf
- 中国国家标准 GB/T 6675.14-2025玩具安全 第14部分:指画颜料要求和测试方法.pdf
- 中国国家标准 GB/T 33772.3-2025质量评定体系 第3部分:印制板及层压板最终产品检验及过程监督用抽样方案的选择和使用.pdf
- 《GB/T 33772.3-2025质量评定体系 第3部分:印制板及层压板最终产品检验及过程监督用抽样方案的选择和使用》.pdf
最近下载
- 2025年全真模拟房地产经纪人协理考试试题及答案.doc VIP
- GB∕T 2421-2020 环境试验 概述和指南.pdf
- 高中数学 《高中数学知识要点及解题方法精粹》.docx VIP
- 麦克维尔变频螺杆式风冷热泵机组PM-MHSV-C004.pdf
- 山东省济南市槐荫区2024-2025学年二年级上册期末测试数学试卷(含答案).pdf VIP
- 《GB_T 17626.5-2019电磁兼容 试验和测量技术 浪涌(冲击)抗扰度试验》专题研究报告.pptx
- CTT2000LM用户手册(维护分册)教程文件.docx VIP
- 2025年山东专升本计算机真题及答案.docx VIP
- 工业和信息化领域数据安全风险评估实施细则.pptx VIP
- 江西省“三新”协同教研共同体2025届高三12月联考生物学试卷(含答案).docx VIP
原创力文档

文档评论(0)