- 1、本文档共2页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
关于企业组长的竞聘演讲稿
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 关于HR人力资源部实习报告总结.doc
- 关于ppt精彩演讲技巧.doc
- 关于《骆驼祥子》读书笔记.doc
- 关于万圣节600字作文.doc
- 关于万圣节晚会的主持词.doc
- 关于万圣节的搞笑短语大全.doc
- 关于万圣节英语资料:万圣节的起源 中英文对照.doc
- 关于万圣节的英语作文及中文翻译.doc
- 关于三严三实内容学习研讨.doc
- 关于三八国际妇女节学校教师代表的演讲稿.doc
- 基于 DNN 的预编码在具有实际相移的 RIS 辅助毫米波 MIMO 系统中的应用-计算机科学-深度神经网络-多输入多输出系统-可重构智能表面.pdf
- 人机协作与自适应赛博物理系统中的伦理考量-计算机科学-自适应网络物理系统-人机编队-人机协作.pdf
- 研究软件工程师和软件工程研究人员说同一种语言吗?-计算机科学-自然语言处理-软件工程.pdf
- 低光行人检测的自动标注-计算机科学-图像处理-行人检测.pdf
- 用于学习通过可微体素化的分割的血管的参数形状模型-计算机科学-机器学习-参数化血管模型.pdf
- 2024年新人教版一年级数学上册课件 第六单元 复习与关联 1.数与运算.pptx
- 2024年新人教版一年级上册数学 四 11~20的认识 整理和复习 教学课件.pptx
- 2024年新人教版数学七年级上册 5.1.2 等式的性质 教学课件.pptx
- 2024年秋新北师大版七年级上册数学教学课件 第5章 问题解决策略:直观分析.pptx
- 2024年新苏教版数学一年级上册全册课件 第一单元 0~5的认识和加减法第3课时 几和第几.pptx
最近下载
- 古代画中的仕女图10幅.pdf VIP
- 高校教师岗前培训题库高等教育学.pdf VIP
- 2024年新高考全国Ⅰ卷数学试卷试题真题答案详解(精校打印).docx VIP
- 苏科版九年级上册物理课件 二、电路连接的基本方式 2节 电路连接的基本方式.pptx VIP
- T_CCTAS 157-2024 陆路交通基础设施隧道智能设计数字化技术规范.docx
- 中心静脉导管并发症处理.pptx VIP
- 52个奥数解题方法.pdf VIP
- 2024年新人教版英语三年级上册课件 Unit 4 Part A 第1课时.pptx VIP
- 监测设备、报警仪器和辐射防护用品登记表.docx VIP
- 22rum猜想想要读写快还是存储省又三选二.pdf VIP
文档评论(0)