- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
生产部负责人年度工作交流
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 生产技术人员个人简历模板.doc
- 生产技术工程师个人简历范文.doc
- 生产技术工程师简历范文.doc
- 生产技术总监个人简历.doc
- 生产流水线个人实习总结.doc
- 生产流水线实习总结.doc
- 生产流水线实习报告范文.doc
- 生产流水线实习报告范文1000字.doc
- 生产环保实习报告5000字模板.doc
- 生产简历模板:生产主管简历.doc
- 2025年1,2-环氧丁烷行业洞察报告及未来五至十年发展趋势预测报告.docx
- 开学班级班规学习.pptx
- 2025年1,2-苯二胺行业洞察报告及未来五至十年发展趋势预测报告.docx
- 2025年2,3,6-三甲基苯酚行业洞察报告及未来五至十年发展趋势预测报告.docx
- 2025年2,3-二甲基吡嗪行业洞察报告及未来五至十年发展趋势预测报告.docx
- 2025年2-氨基异丁酸行业洞察报告及未来五至十年发展趋势预测报告.docx
- 2025年2,4-二硝基苯酚行业洞察报告及未来五至十年发展趋势预测报告.docx
- 2025年2-羟基苯甘氨酸行业洞察报告及未来五至十年发展趋势预测报告.docx
- 2025年2-甲基丙烯行业洞察报告及未来五至十年发展趋势预测报告.docx
- 2025年测试测量仪器行业洞察报告及未来五至十年发展趋势预测报告.docx
最近下载
- 管理学案例两面针公司.ppt VIP
- Roland罗兰GW-8说明书 中文.pdf VIP
- 亚吉铁路运营现状及问题分析.pdf VIP
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试参考题库附答案解析.docx VIP
- 大理州旅游美宿基本要求与评价.pdf VIP
- 2025年国开电大机考网考题库04008_理工英语4.doc VIP
- 中建EPC项目总承包管理方法与实务2024.docx
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试模拟试题及答案解析.docx VIP
- 2025年下半年新疆塔城地区急需紧缺人才引进243人笔试备考题库附答案解析.docx VIP
- 2025年铁路列车员(中级)职业技能鉴定参考试题库-下(判断题汇总).docx VIP
文档评论(0)