- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
社区2013综治年度工作总结报告
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 研究生学习生活自我评价.doc
- 研究生学生干部思想报告1000字.doc
- 研究生实习鉴定表范文.doc
- 研究生学生干部思想汇报1000字范文.doc
- 研究生就业自荐信素材.doc
- 研究生开学典礼发言稿范文.doc
- 研究生思想体会1500字:对未来的展望.doc
- 研究生思想体会范文:坚持社会主义道路.doc
- 研究生思想报告范文:领悟人生价值.doc
- 研究生思想汇报1500字.doc
- 2025塔里木油田分公司秋季高校毕业生招聘(156人)笔试参考题库附答案解析.docx
- 2025湖北黄石经开产投公司招聘工作人员(六)笔试模拟试题及答案解析.docx
- 2025天津市南开区教育系统公开招聘高层次人才10人笔试备考题库及答案解析.docx
- 2026中国地震局事业单位招聘235人笔试备考题库及答案解析.docx
- 2026中国移动通信集团山西有限公司校园招聘笔试参考题库附答案解析.docx
- 2025中国石油天然气股份有限公司天津销售分公司秋季高校毕业生招聘20人笔试备考题库及答案解析.docx
- 2025中国石油宁夏销售分公司秋季高校毕业生招聘15人笔试模拟试题及答案解析.docx
- 2025年医药健康行业医药创新与健康管理科技研究报告.docx
- 2025年吉安县公安局面向社会公开招聘留置看护男勤务辅警29人笔试参考题库附答案解析.docx
- 2026中国电力科学研究院有限公司校园招聘笔试参考题库附答案解析.docx
最近下载
- 小学语文教学中的困惑与思考解析.doc VIP
- GBT 17888.3-2020《机械安全 接近机械的固定设施 第3部分:楼梯、阶梯和护栏》(1).docx VIP
- YST5230-2019 边坡工程勘察规范 (2).pdf VIP
- 应征入伍服兵役高等学校学生国家教育资助申请表1(样表).docx
- 21.1 一元二次方程 课件(共20张PPT).ppt VIP
- 胡寿松自动控制原理7版课后答案.docx VIP
- 冠心病健教育讲座.doc VIP
- 脑卒中一病一品护理汇报.pptx VIP
- 高中化学全套思维导图(2023 最全高清精品版).doc VIP
- 部编版六年级语文上册第一二单元综合知识测试题(有答案).docx VIP
文档评论(0)