- 1、本文档共2页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
试用期个人工作总结模板范文
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 证劵公司实习个人鉴定.doc
- 证婚人在婚礼上的讲话范本.doc
- 证婚人在结婚典礼上的致辞.doc
- 证婚人婚礼致辞稿.doc
- 证婚人婚礼致辞(范例).doc
- 证据保全申请书范本.doc
- 证明书格式.doc
- 证明信范文大全.doc
- 评优1500字个人简介.doc
- 评助理工程师工作总结.doc
- 考点解析-京改版数学8年级上册期末试题及完整答案详解【历年真题】.docx
- 部编版二年级上册道德与法治期中测试卷附完整答案(名师系列).docx
- 部编版二年级上册道德与法治期中测试卷及参考答案【突破训练】.docx
- 考点解析-京改版数学8年级上册期末试题AB卷附答案详解.docx
- 旅游企业品牌定位与营销策略.docx
- 考点解析-京改版数学8年级上册期末试卷(真题汇编)附答案详解.docx
- 考点解析-京改版数学8年级上册期末试卷(真题汇编)附答案详解.docx
- 部编版二年级上册道德与法治期中测试卷含答案【最新】.docx
- 部编版二年级上册道德与法治期中测试卷【考点提分】.docx
- 考点解析-京改版数学8年级上册期末试卷带答案详解(突破训练).docx
文档评论(0)