- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
财务人员的党性分析材料
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 谢师宴学生致辞词.doc
- 谢师宴家长致词范文.doc
- 谢师宴教师致辞范文.doc
- 谢师宴祝酒词范文.doc
- 谢师宴老师致辞范本.doc
- 谢师宴致辞范本.doc
- 谢师宴邀请函范文大全.doc
- 财产保险公司实习心得体会模板.doc
- 财产保险公司暑假实习报告.doc
- 财产保险基本险合同范本.doc
- 2025年四川省凉山州德昌发展和财政局招聘编外人员考前自测高频考点模拟试题含答案详解.docx
- 2025年吉林省通化市集安市审计局招聘考前自测高频考点模拟试题含答案详解.docx
- 2025年吉林省吉林市船营区审计局招聘考前自测高频考点模拟试题及答案详解1套.docx
- 2025年吉林省白城市镇赉县派出所招聘协(辅)警6人考前自测高频考点模拟试题及答案详解1套.docx
- 2025年四川省内江市市中区派出所招聘协(辅)警6人考前自测高频考点模拟试题含答案详解.docx
- 2025年四川省宜宾市兴文县街道办事处招聘公益岗10人考前自测高频考点模拟试题含答案详解.docx
- 2025年四川省自贡市大安区审计局招聘考前自测高频考点模拟试题含答案详解.docx
- 2025年四川省乐山市井研县机关车辆服务中心招聘考前自测高频考点模拟试题及答案详解1套.docx
- 2025年北京市北京市顺义区派出所招聘协(辅)警6人考前自测高频考点模拟试题及答案详解1套.docx
- 2025年吉林省长春市二道区街道办事处招聘公益岗10人考前自测高频考点模拟试题含答案详解.docx
最近下载
- 热分布报告样本.pdf
- 2025年一建一级建造师建筑实务案例分析考点重点知识总结高分笔记.pdf VIP
- 手足口病的诊断与治疗课件.ppt VIP
- 会计法律法规答题答案.doc VIP
- 我国商业银行开展绿色信贷业务存在的问题和对策.docx VIP
- 医院消防安全除患整治攻坚行动工作总结8篇.docx VIP
- 《桃花源记》比较阅读85篇(历年中考语文文言文阅读试题汇编)(含答案与翻译)(截至2020年).doc
- 2025年北京东城区高三一模高考英语试卷试题(含答案详解).docx
- 2024潍坊护理职业学院招聘笔试真题及参考答案详解一套.docx VIP
- 年产300吨2-乙酰呋喃分离工段的工艺设计.docx
文档评论(0)