航海英语2580 1951-2209.doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
航海英语2580 1951-2209

[1951] What is LEAST likely to cause ignition点燃 or fuel vapors燃油蒸汽 ?______. A. Static electricity B. An open running electric motor C. Loose wiring D. Explosion proof lights KEY: D哪个是最低可点燃可燃蒸汽的?防爆灯 [1952] What is meant by the term “ luffing the boom 升降运动” of a crane ?______. A. Stopping the boom B. Topping上 or lowering下 the boom C. Moving the boom left or right ?D. All of the above KEY: B在克令吊中luffing the boom术语意思是?吊杆向下或向上。 [1953] What is meant by the term TOPPING 超越THE BOOM ?______ A. Lowering the boom B. Raising the boom C. Spotting the boom over the deck D. Swinging the boom athwartships KEY: BTOPPING THE BOOM术语的意思是什么?吊杆向上。 [1954] What is meant by the term two-blocked 滑车? A. The bottom block touches the top block. B. The line has jumped the sheaves. C. There are turns in the fall. ?D. You have two blocks. KEY: A两个滑车在一起时什么意思?一个滑车在上一个滑车在下。 [1955] What is meant by veering 顺转the anchor chain?______ A. Bringing the anchor to short stay B. Heaving in all the chain C. Locking the windlass to prevent more chain from running out D. Paying out支付,送出 more chain KEY: D顺转送出的锚链是什么意思?送出更多锚链。 [1956] What is MTI?______. A. The foot / tons needed to trim the vessel by 1 inch. B. The foot / tons needed to trim the vessel by 1 foot. C. The moment needed to trim the vessel by 1 centimeter. D. The amount of vessel will trim when loading 100 tons 100 feet from the tipping Center KEY: AMTI是什么意思?吃水差变化一英寸所需要的纵倾力矩。 [1957] What is NOT a characteristic特点 of cardinal marks? A. Yellow and black bands B. White lights C. Square or triangular topmarks D. Directional orientation to a hazard KEY: C哪个不是方位标的特点?方形和三角的顶标。 [1958] What is NOT a precaution to be taken when topping off?______. A. Reduce the loading rate. B. Notify the engine room of the procedure. C. Maintain communications with the dock m

文档评论(0)

80219pm + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档