MS-0XX Sub base construction.docVIP

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
MS-0XX Sub base construction

Method Statement for Sub Base Filling 0 12 June 2009 Issued for Engineer’s Review and Approval Nandana Amunuthuduwa Li Xing Fu Yan Wei Jie Deng Bo Rev. Date Status Prepared by Reviewed By Construction Department Checked and Submitted by Approved By Project Manager Table of Contents 1. Introduction and General Information 3 1.1 Location of Works 3 2. Materials 3 3. Equipment 3 4. Safety Management and Control 3 5. Method and Procedures 3 5.1 Construction of Pipe Culverts 3 6. Concrete work 6 7. Random Rubble Masonry 7 8. Plastering Work 7 9. Backfilling 7 10. Quality Control 7 11. Measurement Control 8 Introduction and General Information This method statement provides the details of the materials, the equipment, the procedure and relevant documents related to the construction of sub base fill. 1.1 Location of Works The locations of the pipe culverts will be the locations shown on the drawings or as established by the Engineer. Materials The major materials used for the construction of pipe culverts include, but are not limited to the following. Sub Base Material Type I Equipment The major equipment used for the construction of pipe culvert works include, but are not limited to the following. Loader Backhoe / Excavator Motor Grader Skid Steer Loader Rammer / Plate Compactor 5 ton Roller / 1 ton Roller Water Bowser Soil Testing Equipment Safety Management and Traffic Control Traffic warning signs shall be displayed in advance to make aware of the incoming drivers about the working area. Excavated area shall be barricaded either using barricade tapes, traffic cone or any other suitable recommended device. One person equipped with proper flags will be deployed when unloading the material from the dump trucks to control traffic while reversing and unloading. Two traffic controllers will be deployed on either side of the working stretch if working area is obstructing two way traffic. Flow Chart Metho

文档评论(0)

sb9185sb + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档