索网幕墙及采光顶计算
项目概述
General Project Information
钢缆玻璃墙面和雨棚
Cable-Net Facade Canopy
本工程的两座钢缆玻璃墙面各20m×75m,位于东立面E轴至H轴,及西立面C轴至F轴。立面玻璃分格为2.025m×1.8m(或2.15m),采用钢化夹胶玻璃。
Two sets of steel cable net wall spaces in this project is 20m×75m respectively, located in axis E and axis H in east vertical plane and axis C and axis F in west vertical plane. The subdivision of vertical plane glass is 2.025m×1.8m(or .15m). is adopted.
玻璃幕墙由一组横向与竖向钢缆组成的单层平面索网来支撑,竖直钢缆在外侧,水平钢缆在内侧。玻璃通过铸造玻璃夹钳安装在钢缆上,在钢缆的交叉点处,夹钳通过螺栓固定。
Glass curtain wall shall be supported by single layer flat string net consisting of a set of horizontal and vertical steel cable. Vertical steel cable is in the outside and horizontal steel cable is in the outboard. Glass is installed on the steel cable through cast glass pincers fixed through bolts at the point of junction.
钢缆锚固在钢框架上,框架设于整个玻璃墙面的周边,并在每四层处有一条水平支撑钢结构,框架在有水平支撑钢梁的位置与土建连接,考虑结构在地震及温度荷载作用的变形,通过一侧的方销,释放整个钢框架一侧的水平位移约束,连接点采用竖向长圆孔,整个钢框架在竖向方向的伸长将被允许,从而在构造上解决了温度荷载及地震荷载导致主体结构变形时对钢结构的破坏。
Steel cable is anchored on the steel frame arranged in the perimeter of whole glass wall space. There is a steel structure supported horizontally at each four layers. Frame is connected to the civil work in the position with horizontally supported girder steel .Taking into account the deformation during the action of earthwork and temperature load, the horizontal displacement restraint on one side of whole steel frame is released through square cotter on one side. Vertical long circular orifice is used in the tie point. The stretch of whole steel frame in vertical direction will be permitted, solving in structure the damage to steel structure when temperature load and earthquake load result in the deformation of main block structure.
玻璃采光顶
Glass Roof
玻璃采光顶位于东西立面上的两处玻璃墙面之间,在C轴及H轴间。采光顶两端为20面宽,内部区域减小到9m,主横梁跨度20m,间距8.1m,钢悬索横梁跨度8.1m,间距与索网幕墙一致为2.025m。
Glass roof is located between glass wall spaces and between axis C and axis H in east and west vertical plane.Two ends of monitor is 20 plane wid
您可能关注的文档
- 七年级人教版下第十章二元一次方程组复习教案2.doc
- 。。。。。。.doc
- 二元一次方程组--备课讲义.doc
- 缺铁贫.ppt
- PCA101-设备CIP作业管理指导书.doc
- 制冷剂介绍.ppt
- 硝酸钠安全技术说明书(MSDS).doc
- 金相显.doc
- 四级阅读理解的技能.doc
- 六级考试完形填空解题步骤.doc
- 2023-2024学年广东省深圳市龙岗区高二(上)期末物理试卷(含答案).pdf
- 2023-2024学年贵州省贵阳市普通中学高一(下)期末物理试卷(含答案).pdf
- 21.《大自然的声音》课件(共45张PPT).pptx
- 2023年江西省吉安市吉安县小升初数学试卷(含答案).pdf
- 2024-2025学年广东省清远市九校联考高一(上)期中物理试卷(含答案).pdf
- 广东省珠海市六校联考2024-2025学年高二上学期11月期中考试语文试题.pdf
- 2024-2025学年语文六年级上册第4单元-单元素养测试(含答案).pdf
- 2024-2025学年重庆八中高三(上)月考物理试卷(10月份)(含答案).pdf
- 安徽省安庆市潜山市北片学校联考2024-2025学年七年级上学期期中生物学试题(含答案).pdf
- 贵州省部分校2024-2025学年九年级上学期期中联考数学试题(含答案).pdf
文档评论(0)