- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
350节瘤处理意见
Dear Mr. Zha Xiangguo,
?张向国:
We are waiting for you and expecting at our site at the earliest. Meanwhile, we faced some difficulty in our Blast Furnace no.3. I like to explain in detail and in case you are not in a position to understand the problem kindly give a phone call.
?ESL 350高炉面临一些困难,以下是详细描述,并请给出解释:
Last few days our furnace is not giving good production and it is in the range of 500-600 TPD. We took a shutdown and lowered the raw material level 9 metre below the stock level. After opening the top manhole, we observed the furnace inside through manhole. On investigation we found a large chunk of scaffolding material build up around 65% of peripheral area around lower stack zone.
?近期,350高炉 生产不是顺利,每天产量在500-600吨,我们采取了休风并把料线降到9米水平,低于探尺以下,打开人孔后观察到在炉身下部区域一个巨大的环形瘤(由原料组成)。大约占据炉身下部区域65%的范围;
I request to get some ideas from Laiwu Steel Plant or other places to drop this scaffolding or to dissolve this scaffolding. Moreover, on details of furnace shell study, we found 3 layers of 4 nos. holes at different elevation of furnace stack accretion inspection hole .Kindly give us the idea about the purpose of these holes and how these can be utilized to remove the scaffolding.
?我希望从莱芜钢厂或者其他地方得到一些去除这个瘤的想法或者帮助解决这个问题,再有在炉身部位设计大探瘤孔3层4个/层;请说明这些探瘤孔的用途,如何用来去除
In addition to the above, kindly indicate the quantity of water to be maintained in different level of Cooloing Stave during shutdown of furnace for more than 12 hours. In case you have standard chart of reduction of water quantity with hours of shutdown, kindly forward us the same.
?另外:请提供高炉休风期超过12小时,炉体冷却水量的控制要求,按照中国国内的相关操作及规范。
Thanks Regards,谢谢
S?N Goswami
Dear Mr Goswami:
After check your E-mail I discussed with Laiwu Steel plant process technology engineer,we give below sggest for refrecec :
1.采用洗炉方法:Furnace washing operation :
1.1使用萤石洗炉,尽量保持萤石布在高炉靠近边缘区域;Use fluorite as washing dose ,keep the fluorite discharged inside the furnace edge area as possible .
高炉轻负荷炉料结构;炉温[Si]控制在1.3-1.5%左右;铁水大于1480℃;煤比控制在:0Kg/THMTL以下。炉渣
您可能关注的文档
最近下载
- DB3201_T 1075—2022紫云英栽培技术规程.pdf VIP
- 高考物理动能与动能定理题20套(带答案)含解析.doc VIP
- 征信电子版PDF个人信用报告简版2024年12月最新版可编辑带水印模板.pdf VIP
- BX系列行星摆线针轮减速机选型手册.pdf VIP
- 2025教师招聘幼教简单100题.pdf VIP
- 一种肠内营养配制装置.pdf VIP
- 特殊作业管理疑难问题解析.pdf
- JC_T 2848-2024《玻璃纤维增强石膏(GRG)装饰制品》.pdf VIP
- 第10课《往事依依》课件(共27张PPT)-2024-2025学年统编版语文七年级上册(2024).pptx VIP
- 外研版(2024)新教材小学三年级英语下册第二单元Unit 2 作业设计方案.docx VIP
文档评论(0)