- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
kek访问报告
Progress and Plan for Superconducting RF Cavity RF Group Progress in Last Year Transport two SC cavity modules and couplers from harbor to IHEP by air-suspended truck Leak check after transportation (instructed by Prof. Mitsunobu, MELCO send a Supervisor to check all of things) Evacuate niobium cavity cell and insulation vacuum vessel, high pressure rising up of helium vessel and nitrogen cooling channel. Do leak test for niobium cavity cell and insulation vacuum vessel. Prepare clean work environment Design and construct clean room of class 10’000 for cavity assembly in RF hall of building six. Design and construct clean booth of class 100 for HOM damper assembly. Design and construct clean cap of class 100 for coupler assembly. Progress … con’t (1) Assembly of beam taper, RF bellow, gate valve and ion pump, as well as vacuum gauge and mass analyzer together. It include two SBP and two LBP module Ultrasonic washing, ultrapure water rinsing for each beam taper. Connected all components on to the beam taper. Leak test and high temperature baking. HOM damper baking (Prof. Furuya, a S.V from MELCO) Ferrite surface check. (There exist a remarkable cracking on the ferrite of the SBP2 HOM damper, KEK borrowed their spare one to us via Melco) Connect HOM damper on the beam taper. Baked four HOM damper by heated cycle water around 45 Celsius degree for two months. Progress … con’t (2) Assembly of the No.2 SCC module (Prof. Mitsunobu and Furuya, a S.V from MELCO) Slow leak cavity, coupler and HOM damper in sequence. Mount coupler on the cavity module. Connect SBP and LBP HOM damper on to the both side of cavity module separately. Evacuate whole module and do leak test. Ion pump baking. Move the No.2 SCC module to the horizontal test room Preparation for final performance test (Furuya, a S.V from MELCO) Locate and adjust module to the right site in test room. High power waveguide connection. Connect cryogenic transfer line and safety valve, some modification will be done.
您可能关注的文档
最近下载
- 【大单元教学】第四章 中国的经济发展 单元教学分析 人教版地理八年级上册.docx
- 历届茅盾文学奖获奖作品名 单.doc VIP
- ANSYS机翼模型模态分析详细过程.pdf VIP
- 【有“化”好说1】必修1 物质的量、氧化还原反应.pdf VIP
- 检验仪器分析技术 课件 第一章 临床检验分离仪器.pptx
- 煤矿用液压支架 第1部分:通用技术条件及编制说明.pdf VIP
- 有化好说2必修1物质量氧化还原反应.pdf VIP
- 第二课か行高中日语初级入门五十音图.pptx VIP
- 幸福的职业的教师演讲稿PPT.pptx VIP
- 《旅游景区服务与管理》教案 第4课 旅游景区咨询服务与旅游景区投诉受理服务.pdf VIP
文档评论(0)