4.5.2-Boiler
4.5.2 BOILER AND AUXILIARY PLANT
The following section specifies the technical requirements for the boiler and associated plant within the power plant island. The Bidder shall provide all the requested information and complete the relevant schedules as part of the Bid submission.
Steam generator type shall be as follows:
Natural or controlled circulation drum type
Outdoor type suitable encased to provide weather protection
Top supporting
Welded wall
Balances draft
Fueled with pulverized coal
Front and rear wall opposed, or tangentially fired
Field assembled
The steam
您可能关注的文档
- 迎新球赛.doc
- 辽阳历年水灾情况一览.doc
- 远景古建筑设计——广汉三星堆景观大道.doc
- 进货检验计划.doc
- 通信生产楼建设项目的成本控制.doc
- 通州经济开发区2011年南区框架道路工程A标段.doc
- 造林作业设计书.doc
- 道路运输驾驶员货运培训.doc
- 邮政编码的含义.doc
- 邢台兽医论文部分.doc
- 安全生产管理员能力培训.pptx
- 咽异感症与心理健康促进.pptx
- 咽异感症与扁桃体炎的鉴别.pptx
- 咽异感症与抑郁症的关系.pptx
- 咽异感症与环境污染的关系.pptx
- 《生动的数据》课件-2025-2026学年沪教版(新教材)小学美术三年级下册.pptx
- 《校园微电影宣传策划》教学课件-2025-2026学年人美版(北京)(2024)初中美术七年级下册.pptx
- 《 春华秋实绘花鸟》教学课件-2025-2026学年人美版(北京)(2024)初中美术七年级下册.pptx
- 管理层安全培训策略.pptx
- 《把“大自然”穿在身上》教学课件-2025-2026学年人美版(北京)(2024)初中美术七年级下册.pptx
原创力文档

文档评论(0)