Site Modification Procedure for gaps of crane beam.docxVIP

Site Modification Procedure for gaps of crane beam.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Site Modification Procedure for gaps of crane beam

Client: Saudi Aramco Plant Location: Saudi Arabia Project Number: P2101 Site Modification Procedure for the gaps of Crane Beam 00 1/3/2012 WBP-0795-SIPS-QP-00059 ISSUED FOR REVIEW AND APPROVAL Wang Yiwen Benjie de Torres Tanveer Ahmed Rev Date Ref. No. Description Prepared By Checked By Approved By PAGE2 / NUMPAGES5 Table of Revisions Section Details of Revision Updates are identified in bold italics Table of Holds Section Details of Hold Hold Cleared (rev) CONTENTS SCOPE REFERENCES INSPECTION AND TESTING ATTACHMENTS Scope This procedure is specailly prepaired for site modification of the gaps between two ajacent crane beams. All the overhead crane beams inside all pump houses , loading racks more or less have the biger gap of more than 1.5mm, which is can,t meet the crane supplier,s requiment . The procedure incorporated the crane suppier’s requirment and IBSF’s suggested solution ,and mainly based on the PROCEDURE FOR STEEL STRUCRE WELDING IN SITE, which is already aproved on ;and WORK PROCEDURE FOR TOUCH-UP FOR COATING aproved on 24.AUG.2011.Meanwhile the procedure Reference AWS D1.1 Structual Welding Code-Steel ASME SEC IX Standard for Welding and Brazing IBSF Shop drawing and Manufacture,s Specification Saudi Crane Manufacture,s Specification Modification procedure Site joint Inspection Shoud be conducted by construction team , Sinopec QC personnal and PID (if required )to measure all the gaps ,and make a record for tracing. The records shall include the Job No, Beam No,gap value, site joint signature For the gap 4mm and above, ask IBSF to provide a slice as filler material, the slice is the same section size of the monorail beam without coating. The thickness of the slice is 1mm smaller than the relevent gap. If the required slice thickness is more than 8mm ,both the slice and the beam should machine 45 degree single bevel inside the flange ,the bevel area is as per the welding area , and the proposed weld be

文档评论(0)

sd44055 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档