- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2006年外贸单员外贸跟单操作实务试卷
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the quality management system of the project. A management review meeting held each year, on the implementation of the quality policy, objectives and review of the problems and propose corrective measures. Efforts and resources necessary for optimal allocation of project construction management (personnel, finance, facilities, information, etc). 3.2 with customer focus project staff establish a customer-focused thinking, fully aware that meet their customers needs and expectations is the fundamental pursuit of production and services projects. Projects in production and service processes, to: 3.2.1 identify and determine the needs and expectations of the project legal person, interests as the interests of the customer, with customer satisfaction as satisfied, good faith and cooperation, win-win and development; 3.2.2 needs and expectations of the project legal person into production and service management or technical requirements, and allocation of appropriate resources; 3.2.3 meet legal requirements and strive to exceed their expectations. 3.2.4 customers on the quality of projects put into operation for standards, in accordance with the national standard of quality works. 3.2.5 regulations and standards requires the State and issued by the Ministry of the project related to the current version of the technical specifications, procedures, design institutes and
including incentives) to ensure the achievement of the quality objectives. According to the companys quality system documents, combined with the specific circumstances of the project, preparation of project quality manual, procedures and work related to the project implementation rules to improve the qualit
您可能关注的文档
最近下载
- T∕CACM 1066.2-2018 中医治未病标准化工作指南 第2部分:标准体系.docx VIP
- 技术服务措施及保障措施方案.docx VIP
- 新媒体环境下的微博营销【文献综述】.doc VIP
- 2021钻床工考试-初级钻床工考试(精选试题).doc VIP
- 化工企业双重预防机制.pdf VIP
- (铁总计统〔2017〕177号 )中国铁路总公司关于进一步加强铁路建设项目征地拆迁工作和费用管理的指导意见.pdf VIP
- 深圳新桥街道万丰社区大朗山片区城市更新项目.pdf
- 中小学劳动教育课程如何创新与实施.docx VIP
- 大航海时代OL陆战技巧学习指南.docx
- 集中式山地光伏电站方阵区直流电缆敷设技术要求.pdf VIP
文档评论(0)