- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一级建造师历年题2008年《建筑工程管理与实务》考试试卷及答案
of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Yibin city, preliminary rail traffic levels service levels, system model, and technical standards. 5, to ensure that network can be implemented. 6, stable conditions for planning and supporting of Yibin city track traffic construction and formation of rail transit industry, provide conditions for the start-up and development of rail transit in Yibin city. 1.7 technical course technology is the projects research program and research ideas. Technology reflects the various stages in the process, logical relations between various levels, research, techniques and phases. Network planning process the whole process can be divided into four parts, namely, background research, network architecture research, planning and implementation of research and programming interfaces. Figure 1.7-1 Yibin city rail transit network planning technology roadmap planning interface is mainly responsible for network planning interface with follow-up planning tasks. Network planning Urban planning system in a transitional position, online network planning is completed, will be carried out as soon as possible the following planning projects: 1, detailed control of the land of rapid rail transit network planning; 2, the partitioning for network planning; 3, joint planning of rail transport and urban transport in other ways; Detailed technical courses see below. Figure 1.7-2 General technology route figure 2nd chapter City status and development planning 2.1 city basic profile 2.1.1
of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Yibin city, preliminary rail traffic levels service levels, system model, and technical standards. 5, to ensure
您可能关注的文档
- 一个不可多得的层悬挑脚手架施工方案.doc
- 一个智能化大楼合布线系统的需求分析.doc
- 一个老工程技术员对土木年轻人的忠告(转载) 2.doc
- 一个老预算人的验之谈.doc
- 一个老预算员的验之谈(很深刻,对初学者很有用).doc
- 一个能使人类长不老的科技项目.doc
- 一临学生职业生规划方案.doc
- 一二九活动策划稿30日最终版.doc
- 一个超高层项目筋内部技术交底.doc
- 一些很难找到的是很好听的英文歌.doc
- 2025至2030中国移动治疗台行业发展研究与产业战略规划分析评估报告.docx
- 2025至2030链激酶行业细分市场及应用领域与趋势展望研究报告.docx
- 2025至2030爆炸物探测扫描仪行业市场占有率及有效策略与实施路径评估报告.docx
- 2025至2030四川省智能制造行业细分市场及应用领域与趋势展望研究报告.docx
- 2026届高三二轮复习试题政治大单元突破练1生产资料所有制与分配制度含解析.docx
- 2026届高三二轮复习试题政治大单元突破练16哲学基本思想与辩证唯物论含解析.docx
- 2026届高三二轮复习试题政治大单元突破练2社会主义市场经济体制含解析.docx
- 浙江省衢州市五校联盟2025-2026学年高二上学期期中联考技术试题-高中信息技术含解析.docx
- 浙江省金丽衢十二校2026届高三上学期11月联考政治试题含解析.docx
- 2026届高三二轮复习试题政治大单元突破练7领导力量:中国共产党的领导含解析.docx
原创力文档


文档评论(0)