中央电大国际经法试题及答案

coupling Centre shall be checked, the second poured concrete strength of more than 70%. In the process of reaming or boring, apart from the special provisions in factory, does not allow any work that may affect the coupling Centre, such as irrigation, to cylinder connections to flood the condenser pipes and so on. Well boring, hinge bolt hole flange with coupling of vertical, not oblique. Mounting