《外贸会计》教大纲.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《外贸会计》教大纲

《外贸会计》教学大纲是国际贸易专业的,旨在介绍外贸会计的基本理论、方法及其在典型实例中的应用。 外贸会计的业务是跨国境的,业务进口、出口两个方面。学习这门课的是了解外贸企业的主要的财务活动过程及会计核算学习外贸企业的国内、国外结算方法,各种进出口业务的会计处理,另外,还要学习外汇的相关知识基本要求:教学内容: 第一节 第二节 外贸会计基本要求:教学内容: 第一节 基本要求 通过对的学习,使学生教学内容: 第一节基本要求 通过对的学习,教学内容: 第一节基本要求:教学内容: 第一节 第二节 基本要求:教学内容:学时分总论 be carried out in time rust and antirust paint twice. While skeleton construction curtain wall fireproof, antisepsis, mine should be simultaneously, all skeletons complete after the required time and concealed work inspection, acceptance of concealed work qualified before the stone plaque installed. Stone in stone before they can use pollution prevention performance, radiation energy, water absorption properties and bending strength of various performance testing protective treatment and six stone two times, and minimize chromatic aberration, chromatic aberration under control mainly in the specification sheet and the stone material control, specification order form should try to distinguish between separate parts orders. Stone cutting must be carried out according to the same part of the same batch, different parts of different facades of stone panels applied when cutting different symbols of letters or Arabic numerals differentiates, in order to facilitate timely and accurately identify different stone when installing special mounting parts. Resolutely put an end to abuse with abuse. In addition to control and the local color, the other in the stone wall construction should be carried out before publishing, model wall dimensions as 84000mmx2000mm, stone size options for 1200mmx400mm be carried out in time rust and antirust paint twice. While skeleton construction curtain wall fireproof, antisepsis, mine should be simultaneously, all skeletons complete after the required time and concealed work inspection, acceptance of concealed work qualified before the stone plaque installed. Stone in stone before they can use pollution prevention performance, radiation energy,

文档评论(0)

gix469 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档