- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
练习册答案人教四年级语文上册
a special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing, it should meet the requirements. Install the coupling housings to ensure embedded rotor coupling within a concave shoulder, and rotor clearance meets the design requirements. 6.4, 6, wearing construction technology of generator rotors demonstration 6.4.6.1 construction preparation and conditions through the stator before loading check and confirm to confirm air tightness test of the stator and stator mechanical, electrical, instrumentation and control and other related work had been completed. Internal cleaning of stator, high power vacuum the surface of the stator. Stator and rotor magnetic Center drainage is complete. In conjunction with the quality, mechanical, electrical and other relevant persons to finally cleaning check the stator, which is clean and free of any debris. Worn rotors check and confirm confirm before loading the rotor air tightness test, electrical test work has been completed. In conjunction with the quality, mechanical, electrical and other relevant persons to finally clean the rotors checked, its interior is clean and free of any debris. By quality, mechanical, electrical and other professionals to conduct an examination of the rotor, confirm the wear condition of the rotor. Special equipment inspection and rotor through the preparation tool before loading inventory, check to confirm that it appears intact, complete tool, tools required for use of wire rope that has a factory certificate and test report; wire rope should select the safety factor ≥ 6; hoist testing qualified; road have been equipment authorized Visa temporary support ties should be a hardwood. Ends bearing end cover with connection of the stator plate or gourds by exclusive lug on the end face of a temporary low-hanging on the
a special tool to measure half a point the rotor shaft runout and simultaneous measurement of two coupling flutter testing
您可能关注的文档
- 粤嵌股份校企合资料.doc
- 粪便自动分析仪zdy-501水分分析仪价格.docx
- 粮油保管员比赛则及试题.doc
- 系统文化与设计关系.doc
- 系统集成(考前习试题及答案附加题).doc
- 紧致乳液 致乳液排行榜.doc
- 絮凝沉淀池结构程施工方案.doc
- 红外报警监控系设计报告.doc
- 红木家具厂_环影响评价报告表.doc
- 红河学院201年毕业论文模板毕业论文范文下载.doc
- 中国快速感应炉行业市场规模及未来投资方向研究报告.pdf
- 中国昏睡驾驶员警报系统行业市场规模及未来投资方向研究报告.pdf
- 中国昏睡检测器行业市场规模及未来投资方向研究报告.pdf
- 中国快速半球摄像机行业市场规模及未来投资方向研究报告.pdf
- 中国智能自适应学习系统行业市场规模及未来投资方向研究报告.pdf
- 中国快速打印机行业市场规模及未来投资方向研究报告.pdf
- 中国快速可控硅行业市场规模及未来投资方向研究报告.pdf
- 中国昌河旗下轿车产品品牌(北斗星、利亚纳、派喜)行业市场规模及未来投资方向研究报告.pdf
- 中国快速应用开发行业市场规模及未来投资方向研究报告.pdf
- 中国快速控制原型系统行业市场规模及未来投资方向研究报告.pdf
最近下载
- 学校教师专业成长经验汇报.pptx VIP
- 建标197-2019 高等职业学校建设标准.pdf VIP
- 七上数学期末卷.doc VIP
- 2025-2026学年小学信息技术(信息科技)第三册电子工业版(2022)教学设计合集.docx
- 教师专业成长专业发展培训.pptx VIP
- 第11课 以社会主义核心价值观引领文化建设 课件(共28张PPT)-2025年中职高教版(2025)中国特色社会主义.pptx VIP
- 【期末复习提升卷】浙教版2022-2023学年七上数学期末综合 测试卷1.pdf VIP
- 渐进式延迟法定退休年龄办法解读课件.pptx VIP
- 国有独资有限责任公司章程参考样本.doc VIP
- 2024-2025学年广西南宁市统编版三年级上册期末考试语文试卷.pdf
原创力文档


文档评论(0)