- 1、本文档共51页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2014年江西支一扶笔试真题
2014年江西三支一扶笔试真题答案
“更多详情请进江西网:/?wt.mc_id=bk14392
也可加入江西中公教育官网微信平台:jx-offcn-com
或加入新浪官方微博:江西中公教育”
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head
to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number ... Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 20~30S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the ba
您可能关注的文档
- 2014年9月程教育中心大学英语B统考题库六.doc
- 2014年《经法基础》第六章重难点及例题+.doc
- 2014年上半课程考试大作业税法与会计3.doc
- 2014年上半课程考试大作业税法与会计4.doc
- 2014年中考想品德模拟试卷.doc
- 2014年主管师考试相关专业知识模拟试题及答案解析:.doc
- 2014年事业位参公考试模拟题及答案考试精要(容易出错的题型).doc
- 2014年二建规模拟卷 第三套.doc
- 2014年二建规真题及答案_word版.doc
- 2014年二建规真题.doc
- 2025年成都市玩偶生产荧光涂鸦互动玩偶开发可行性研究报告.docx
- 2025年成都市海绵生产用于体育馆室外运动场地透水改造可行性研究报告.docx
- 2025年天津市体操鞋企业团建运动应用报告.docx
- 2025年上海市溶洞极限运动(速降)场地开发可行性研究报告.docx
- 2025年上海市涵洞工程施工技术应用可行性研究报告.docx
- 2025年上海市体育场馆设施扎带安全防护可行性研究报告.docx
- 2025年上海市牦牛育肥产业园区建设可行性研究报告.docx
- 2025年旅拍宠物陪伴拍摄项目可行性研究报告.docx
- 2025年上海市进口食品节庆主题快闪店可行性研究报告.docx
- 2025年上海市洗选厂尾矿综合利用产业化可行性研究报告.docx
文档评论(0)