焊前预热、焊后热处理程序.docVIP

  • 21
  • 0
  • 约2.19万字
  • 约 20页
  • 2016-11-01 发布于浙江
  • 举报
焊前预热、焊后热处理程序

Procedure Number 程序编号 HY-WP-W-001 Rev. No版本 Page页码 Document Status: 文件: PRE/准备 CFC/执行 Reference procedure No./Rev./参考程序编号/版本: N/A不适用 Document Title文件名称: Procedure for Prewelding Preheating and postwelding heat treatment 焊前预热、焊后热处理程序 Document Type/文件类型 :Procedure工作程序 Name Title 姓名及职务 Signature/Date 签名及日期 Approved by 批准 Prepared by 编制 职务: Title: Reviewed by 审核 Signature/Date: 签名及日期 QA Reviewer QA审核 Translator 翻译 Translation reviewer译审 Copyright Declaration:版权声明 : This document is the property of the SNPEMC. It must not be used, reproduced, transmitted or disclosed without the prior written permission of SNPEMC。本程序未经山东核电设备制造有限公司书面批准不得外用、复制和泄露 Historical Records of Modification 修改历史记录 发布日期Issue date 修改范围及依据Scope and Basis of the Modification 1 Table of Contents 目 录 1 Purpose目的 4 2 Scope范围 4 3 References参考文件 4 4 Responsibilities职责 4 5 Pre-requisite先决条件 5 6 Steps of Operation操作步骤 5 7. Detailed Description详细描述 6 7.1 Detailed Description详细描述 6 7.2 Heat Treatment热处理 9 8 Appendix 附录 16 1 Purpose目的 The procedure is defined as the criteria in preheating, heat treatment and straightening of Shandong Nuclear Power Equipment Manufacturing Co., Ltd for ensuring the smooth implementation of the work. 为山东核电设备制造有限公司进行焊前预热、热处理以及热矫直提供工作依据,保证工作的顺利进行,特制定本程序。 Scope范围 The procedure is applicable for the prewelding preheating and stress-relief heat treatment of all welding joints and straightening of the non-centered pipes of Shandong Nuclear Power Equipment Manufacturing Co., Ltd. 本程序适用于山东核电设备制造有限公司中的所有的焊接接头的焊前预热、消应力热处理以及不对中管的热矫直。 References参考文件 AE Standards B3.1 Power Pipeline Edition 2001, including 2002 Addenda ASME标准B3.1 动力管道2001版,2002增补 AE Standards Volume IX Criteria for Welding and Braze Welding Edition 2001, including 2002 Addenda ASME标准第IX卷 焊接和钎焊评定标准2001版,2002增补 AE Standards Volume III Construction Rules of Nuclear Power Equipments Edition 2001, including 2002 Addenda ASME标准第III卷 核动力设备建造规则2001版

文档评论(0)

1亿VIP精品文档

相关文档