- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
(截止20111026最新版)CLARIFICATION ON HTC PROPOSAL FOR 2x46 MW SGTs
NO. UTILITY CONTRACTORS COMMENT VENDORS REPLY CONCLUSION A GENERAL: The number of supplied STGs shall be 2 complete units which is necessary to be mentioned in the proposal). All of the quantities mentioned in the proposal will be considered as a required quantity for one unit. The proposal shall be revised in accordance with POWER GENERATION STEAM TURBINE MATERIAL REQUISITION document. And Deviation with this document shall be submitted by vendor. Deviation with HEI related standards like Steam Jet Vacuum system and Steam Surface Condenser shall be submitted. A General Arrangement Drawing (Plan Sections) shall be submitted. List of spare parts according to STG MR with the related price for each item shall be supplied. Also, list of recommended spare parts for commissioning operation shall be submitted in a separate list (including the price for each item). Document List shall be submitted. B PROCESS: Only two kind of steam (MP and LP) are available at Refinery, which can be used for Ejector system (motive, first and second) and the necessary control valve and desuperheater shall be supplied by vendor (if required). The vendor shall provide and supply any facilities or equipment to use the available steam for ejectors and sealing system. Only one kind of steam (HP inlet and LP exit) are available which can be used for condensate extraction pumps driver (steam turbine). The steam turbine and the necessary control valve and desuperheater shall be supplied by vendor (if required). The vendor shall provide and supply any facilities or equipment to use the available steam for the condensate extraction pumps driver (steam turbine) and all auxiliaries. Please submit HM balance for the STG in all of requested load cases mentioned in document “3034-ED-PR-HMB-0880-A1 Heat Mass Balance power and steam”. HTC shall confirm the capability of STG operation in all of design verification cases. C EQUIPMENT: Scope of Supply: In HP Steam
文档评论(0)