2WORK MEMO(08.08)

WORKING MEMO August 2008-8-01 38. All pipe cover of the engine room block no covered. When inspect some pipe to be opened to check rubbish. 39. The package of 1080-1 M/E was ripping into rags by strong wind, to be change by a new one. 2008-8-4 39. Some de-humidizer was put into the crankcase of 1080-1 M/E. But the quantity was unsuitable. (little) 40. HT13 was taken into blasting Shop directly bypass inspection. 2008-8-5 41. 1080-3 HB02 (no finished) 1). All the v/v and suction haven’t installed and the seam no welding. 2). Some welding seam to be re-welded and grounded. 3). One su