2WORK MEMO(08.08)
WORKING MEMO
August
2008-8-01
38. All pipe cover of the engine room block no covered. When inspect some pipe to be opened to check rubbish.
39. The package of 1080-1 M/E was ripping into rags by strong wind, to be change by a new one.
2008-8-4
39. Some de-humidizer was put into the crankcase of 1080-1 M/E. But the quantity was unsuitable. (little)
40. HT13 was taken into blasting Shop directly bypass inspection.
2008-8-5
41. 1080-3 HB02 (no finished)
1). All the v/v and suction haven’t installed and the seam no welding.
2). Some welding seam to be re-welded and grounded.
3). One su
您可能关注的文档
最近下载
- 电子材料物理部分答案.ppt VIP
- 2025年拍卖师不同类型标的(动产_不动产_股权)公告内容的差异化撰写专题试卷及解析.pdf VIP
- CSC-336C数字式非电量保护装置说明书.pdf VIP
- 2026年初中道德与法治教师资格考试试卷及答案.docx VIP
- 智能微电网动态风险评估与自适应恢复方案__.pdf VIP
- 2025年金融风险管理师非线性产品(如期权)的压力测试建模专题试卷及解析.pdf VIP
- 2025年房地产经纪人投资回报率与抵押贷款评估专题试卷及解析.pdf VIP
- 2025年人教版高一指数函数增长模型专题试卷及解析.docx VIP
- 2025浙江绍兴中广有线信息网络有限公司外包工作招聘2人笔试历年参考题库附带答案详解.docx VIP
- 合肥市深基坑工程技术管理导则.doc VIP
原创力文档

文档评论(0)