- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《软件工程》习题汇锦
一、单项选择题
提示:在每小题列出的四个备选项中只有一个是符合题目要求的,请将其代码填写在下表中。错选、多选或未选均无分。
( )If a system is being developed where the customers are not sure of what they want, the requirements are often poorly defined. Which of the following would be an appropriate process model for this type of development?
(A)prototyping
(B)waterfall
(C)V-model
(D)spiral
( )The project team developing a new system is experienced in the domain. Although the new project is fairly large, it is not expected to vary much from applications that have been developed by this team in the past. Which process model would be appropriate for this type of development?
(A)prototyping
(B)waterfall
(C)V-model
(D)spiral
( )Which of the items listed below is not one of the software engineering layers?
(A) Process
(B) Manufacturing
(C) Methods
(D)Tools
( )Which of these are the 5 generic software engineering framework activities?
(A) communication, planning, modeling, construction, deployment
(B) communication, risk management, measurement, production, reviewing
(C) analysis, designing, programming, debugging, maintenance
(D) analysis, planning, designing, programming, testing
( )The incremental model of software development is
(A)A reasonable approach when requirements are well defined.
(B)A good approach when a working core product is required quickly.
(C)The best approach to use for projects with large development teams.
(D)A revolutionary model that is not used for commercial products.
( )Which of these is not one of the phase names defined by the Unified Process model for software development?
(A)Inception phase
(B)Elaboration phase
(C)Construction phase
(D)Validation phase
( )The things that make requirements elicitation difficult are problems of
(A) scope
(B) understanding
(C) volatility
(D) all of the above
( )The result of the requirements engineering elaboration task is an analysis model that defines which of the following problem domain(s)?
(A) i
您可能关注的文档
最近下载
- COLMO洗衣机工程师资格认证考试题及答案.doc VIP
- 《合理用药与用药安全》课件.ppt VIP
- 配件部经理岗位职责(24篇).docx VIP
- (人教2024版)英语八年级上册Unit 4 大单元教学设计(新教材).docx
- TCECS 179-2023 健康住宅建设技术规程.pdf VIP
- 数字孪生及车间实践第二篇数字孪生研究体系.pptx VIP
- 2025年四川省绵阳市初中学业水平考试语文真题试卷含参考答案与习作例文精品.pdf VIP
- 2024版行政管理培训课件.pptx VIP
- 《公安机关互联网安全监督检查规定》培训与解读课件.pptx VIP
- 数字孪生及车间实践第一篇数字孪生的内涵及研究应用现状.pptx VIP
文档评论(0)