沣西新城应急给水厂项目
深井泵房工程施工方案
编制:
审核:
批准:
日期: 年 月 日 目 录
编制依据
编制依据··············································1
工程概况
深井泵房施工概况······································1
第四节 电气自控施工概况······································2
第三章 项目经理部组成人员
项目经理部组织机构成人员·····························3
项目经理部机构组织···································4
项目经理部各级岗位职责·······························5
施工中平面布置图·····································6
第四章 劳动力、材料、机械设备投入计划
施工材料投入计划·····································7
劳动力安排计划·······································8
安全防护用品计划·····································8
检测仪器设备计划·····································9
第五章 施工方案
第一节 测量放线··············································9
基础施工·············································10
主体工程·············································13
装饰、装修工程········································23
屋面防水工程·········································26
脚手架工程···········································28
给排水及电气安装工程·································33
第六章 施工进度计划及工期保证措施
施工进度计划·········································35
工期保证措施·········································37
工程质量保证措施·····································43
冬期施工措施·········································47
安全施工措施·········································48
文明施工及环境保护措施·······························53
第一章 编制依据
编制依据:
1、《建筑工程施工质量验收统一标准》GB50300-2013
2、《砌体工程施工质量验收规范》GB50203-2011
3、《混凝土结构工程施工质量验收规范》GB50204-2002
3、《砌体结构设计规范》GB50003-2001(2002年局部修订)
4、《多孔砖砌体结构技术规范》JGJ137-2001(2002年局部修订)
5、《建筑地基基础工程施工质量验收规范》GB50202-2002
6、《砌筑工程施工质量验收规范》GB50203-2014
7、《屋面工程施工质量验收规范》GB50207-2002
4、《工程测量规范》GB50026-93
5、《建施扣件式刚管脚手架安全技术规程及验收规范》JGJ128-2000
7、《砌筑砂浆配合比设计规程》JGJ98-2000
第二章 工程概况
工程名称:沣西新城应急给水厂深井泵房工程
建设单位:西咸新区沣西新城投资发展有限公司
设计单位:西安市政设计研究院有限公司
工程地点:西咸新区沣西新城渭河大堤东侧
第一节 建筑部分