网站大量收购独家精品文档,联系QQ:2885784924

Case Study Adenus案例研究adenus.ppt

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Case Studies Case Study Serenbe Palmetto, GA Project Summary Location: Palmetto, Georgia Acreage: 900 Units: Approx. 165 residential units, 115 Live/work units, 6 Commercial units Product Type: Smart Growth community with interconnected, variably-sized settlements, including small villages, hamlets and farmsteads. Master Plan: Two (2) distinct Hamlets (i.e. stand-alone communities), each arranged in an Omega design with 140 residential and commercial units Topography: Gently rolling Soil: Sandy loam Phase I. Summary Selborne Community Units: 140 units, including approximately 50 live/work and 4 commercial Home Prices: $150,000 to over $1 million Absorption Rate: 3-4 years Project Considerations Municipal sewer service was not available Community was planned with environmental sustainability as a top priority Highest and best use achieved through clustered development with substantial open space Minimize upfront capital investment, and spread cost over life of project. Maximize economic return by providing project design flexibility; offering multiple products and price points. Solution must provide for professional operation, maintenance and customer service Solution Turnkey decentralized wastewater system Design Build Operate Collection System Individual septic tanks with gravity collection Treatment Recirculating Sand/Gravel Filter combined with a Constructed Wetland Disposal Subsurface Drip Irrigation Ownership Management Once system is constructed and approved, ownership is transferred to Utility as “Contribution In-Aid” (non-taxable transaction). Utility will own, operate and maintain system in perpetuity. (including individual and central system components ) Utility is certified as wastewater system operator by the State of Georgia Department of Public Health? Utility provides performance bond to the State Health Department and evidence of financial viability to the Public Service Commission Developer Benefits Turn-key sol

您可能关注的文档

文档评论(0)

zyzsaa + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档