- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CAP 311R AIR POLLUTION CONTROL (CONSTRUCTION DUST) REGULATION二
摘要:本文主要介绍了CAP 311R AIR POLLUTION CONTROL (CONSTRUCTION DUST) REGULATION的主要内容。
(ix) site clearance; or
(x) blasting,but does not include any emergency work, excluded work or notifiable work;
road construction work (道路建造工程) means construction of any permanent road, bridge or underpass for vehicular traffic but does not include any maintenance or resurfacing work to an existing road, bridge or underpass;
road opening or resurfacing work (道路开掘或重铺工程) includes excavation, backfilling to trenches, and temporary or permanent reinstatement of existing roads, streets, footway or bridges for the purpose of-
(a) maintenance or resurfacing;
(b) erection of poles or structures;
(c) trial hole opening; or
(d) laying or repairing of pipes, cables, ducts, valve boxes, chambers or any other utility services;site formation (工地平整工程) includes-
(a) excavations on sloping land;
(b) filling;
(c) any earth moving work for preparation of a construction site; and
(d) groundwater drainage work as defined in section 2 of the Buildings Ordinance (Cap 123);specified (指明), in relation to a form or the particulars to be given on a form, means specified by the Authority;
utility services (公用服务设施) means public services involving electricity, lighting, traffic control, gas, telecommunications, cable television, water supply, drainage and sewerage, public transportation, and any associated supporting services. (36 of 2000 s. 28)
(2) For the purpose of this Regulation, a contractor is responsible for a construction site if he is carrying out construction work at the site or, where more than one contractor is carrying out construction work at the site, if he is the principal contractor carrying out such work.
Cap 311R s 3 Notification
(1) The contractor responsible for a construction site where any notifiable work is proposed to be carried out shall give notice to the Authority of the proposal to carry out the
您可能关注的文档
- CAD用法47招..doc
- CAD机械制图习题集..doc
- CAD的一些简单命令..doc
- CAD画图重要笔记..doc
- CAD的学法,超赞!..doc
- CAD的学法,超赞..doc
- CAD系统变量大全..doc
- cad经典快捷方式..doc
- CAD练习图集45张..doc
- CAD绘图员速成..doc
- CAP312CIVILAVIATION(AIRCRAFTNOISE)ORDINANCE一..doc
- CAP358EWATERPOLLUTIONCONTROL(TOLOHARBOURANDCHANNELWATERCONTROLZONE)(APPOINTEDDAYS)ORDE..doc
- Cap45Kshallbetaperedfromitscentretowardsitsperiphery一..doc
- CAP498ATSINGMACONTROLAREA(TOLLS,FEESANDCHARGES)REGULATION二..doc
- Cap59LTheseregulationsmaybecitedastheFactoriesandIndustrial一..doc
- CARD1问题及解答..doc
- case3出口贸易单据..doc
- CaseWesternReserveUniversity-凯斯西储大学..docx
- Case_Interview案例面试..doc
- case工具分类..doc
文档评论(0)