1- pacific gasand electric company(1太平洋天然气和电力公司).doc

1- pacific gasand electric company(1太平洋天然气和电力公司).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
1- pacific gasand electric company(1太平洋天然气和电力公司)

Appendix N4 Start-Up and Performance Testing Protocols Performance Testing The performance tests shall be conducted to verify Project compliance with the performance guarantees specified in Article 2.7 (a), and to demonstrate the ability of the Project and Units to achieve the Generation Operating Characteristics specified in Appendix N3. Table F-1 lists the required performance tests for each type of generating unit design. For facilities consisting of more than one independent Unit, Table F-1 designates whether a test is to be conducted on each Unit or on the overall Project. For facilities that consist of one Unit, all applicable Unit tests shall be conducted for the Project. Table F-1 – Performance Guarantee and Demonstration Tests Test Project Design-Basis* Project Test Unit Tests Performance Guarantee Tests Project Base Electrical Output and Heat Rate 1,2,3,4,5 X Base Reliability 1,2,3,4,5 X Project Peak Electrical Output 1,2,3,4,5 X Extended Guaranteed Electric Output and Heat Rate 1,2,3,4,5 X Demonstration Tests Unit Base Electric Output and Heat Rate 1,2,3,4,5 X Unit Peak Electric Output and Heat Rate 1,2,3,4,5 X Air Emissions 1,2,3,4,5 X Sound Level Emissions 1,2,3,4,5 X Cooling Tower Drift Rate 5 X Evaporative Cooler Effectiveness (if applicable) 3,4,5 X Raw Water 3,4,5 X Demineralized Water 3,4,5 X Waste Water Discharge or Zero Discharge (as applicable) 3,4,5 X Deaerator 4,5, X Standby Electric Generator 1,2,3,4,5 X Minimum Load 1,2,3,4,5 X Regulation with Automatic Generator Control 1,2,3,4,5 X Ancillary Services (as applicable) 1,2,3,4,5 X Unit Start-Up Times 1,2,3,4,5 X Fuel Switching 1,2,3,4,5 X * Project Design Basis 1 – Reciprocating engine-generator 2 – Combustion turbine without water or steam injection or evaporative cooler 3 – Combustion turbine with water or steam injection or evaporative cooler 4 – CC with water or steam injection 5 – CC with cooling tower Test Procedure Seller

您可能关注的文档

文档评论(0)

guanjie8song + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档