SC5096-010-02SM-H 6300沥青船.DOCVIP

  1. 1、本文档被系统程序自动判定探测到侵权嫌疑,本站暂时做下架处理。
  2. 2、如果您确认为侵权,可联系本站左侧在线QQ客服请求删除。我们会保证在24小时内做出处理,应急电话:400-050-0827。
  3. 3、此文档由网友上传,因疑似侵权的原因,本站不提供该文档下载,只提供部分内容试读。如果您是出版社/作者,看到后可认领文档,您也可以联系本站进行批量认领。
查看更多
2 HULL 3 2.1 HULL MATERIALS, GENERAL HULL WORK 3 2.1.1. General 3 2.1.2. Materials 5 2.1.3. Welding 5 2.1.4 Test of tanks, bulkheads, etc. 6 2.1.5 NDT-testing of hull parts 6 2.2 AFTERBODY 6 2.2.1 General 6 2.2.2 Shell panels 7 2.2.3 Main deck with stiffening 7 2.2.4 Bulkheads with stiffening 7 2.2.5 Stern frame section 7 2.3 ENGINE AREA 8 2.3.1 General 8 2.3.2 Shell panels 8 2.3.3 Bottom structure 8 2.3.4 Main deck with stiffening 9 2.3.5 Decks, bulkheads, platforms and tanks 9 2.3.6 Machinery casing 9 2.4 CARGO AREA 9 2.4.1 General 9 2.4.2 Shell panels 10 2.4.3 Bottom structure 10 2.4.4 Main deck with stiffening 10 2.4.5 Transverse bulkheads with stiffening 10 2.4.6 Longitudinal bulkheads with stifeening 11 2.4.7 Wing ballast tanks 11 2.4.8 Independent cargo tanks 11 2.5 FOREBODY 11 2.5.1 General 11 2.5.2 Shell panels 12 2.5.3 Bottom structure 12 2.5.4 Bulkheads and decks above main deck 12 2.5.5 Main deck with stiffening 12 2.5.6 Bulkheads and decks below main deck 13 2.5.7 Chain lockers 13 2.6 DECKHOUSES AND SUPERSTRUCTURES 13 2.6.1 Forecastle 13 2.6.2 Poop and deck house 13 2.6.3 Cargo equipment deckhouse 14 2.6.4 Walk-Way 14 2.7 HULL OUTFITTING 14 2.7.1 Hull and house markings 14 2.7.2 Bottom plugs and sea chests 16 2.7.3 Foundations 17 2.7.4 Bilge keels and fender 17 2.7.5 Bulwarks, gutterbars and breakwaters 18 2.7.6 Funnels 18 2.8 MATERIAL PROTECTION 19 2.8.1 General 19 2.8.2 Surface Preparation 20 2.8.3 Paint Application 21 2.8.4 Inspection 22 2.8.5 Film Thickness 23 2.8.6 Method of measurement 23 2.8.7 Material Protection Guarantees 24 2.8.8 Painting schedule 24 2.8.9 Galvanising and metallising 25 2.8.10 Cathodic protection 26 2 HULL 2.1 HULL MATERIALS, GENERAL HULL WORK 2.1.1. General The vessel to be of all welded construction and to be built of mild normal steel. The vessel to be in conformity with approved classification drawings. Scantlings of hull and superstructure to be in accordance with the requirements of the Classification S

文档评论(0)

zyzsab + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档