- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
[综合交通参考文献翻译
文献翻译姓名:唐艺学号级:运输1201指导教师:翁金贤Lane drops downstream of signalized intersections are found on many urban and suburban streets and highways. The short lane is typically under-utilized at the intersection since drivers avoid using the short lane due to the potential for stressful merges downstream of the signal. This unconventional geometric configuration downstream of the lane drop intersection affects intersection capacity and operations. The current Highway Capacity Manual (HCM) does not take into account downstream lane drop conditions, thereby resulting in significant discrepancy between the HCM defaults and field observed lane utilization factors (LUF).许多城市和乡村街道和公路的信号交叉口处都会有出口展宽,而短车道未被典型应用于交叉口是因为司机由于信号在出口的强制性合流而避免使用短车道。这种交叉口的出口展宽的非传统的几何结构影响了交叉口的通行能力和管理。现行的HCM没有考虑出口展宽的情况,因此,导致了HCM默认值与实测车道使用因数(LUF)之间的重大矛盾。The primary objectives of this research were to identify whether and by how much lane drops affect performance of actuated signalized intersections under various traffic demand levels and lane drop geometries. The research developed LUF prediction models by intersection type from data on traffic, signal and intersection geometry collected in the field. The developed models imply that the downstream lane length and traffic intensity are positively correlated with the LUF and that other geometric variables at the approach may also influence lane utilization. Also, a traffic simulation model was used to quantify the impact of lane drops on intersection operations with various traffic volumes and geometric conditions. Through the simulation, it was found that additional green time, which should reduce delay, was created because of the overloaded full lane at the approach, however; a higher probability of green time termination with maximum green time dominates the benefit of extra green and the approach gains significant extra delays. Based on the data obtained from the simulation, this research quantified the amount of additional delay for the subject movement
您可能关注的文档
最近下载
- 《旅行社经营与管理》课件 第一章 旅行社概述.ppt VIP
- 人教版八年级数学上册分式的加减法练习题精选47.doc VIP
- 最新【人教版】三年级数学上册教科书电子版教学课本(2025年秋-新教材版本).docx
- 【精选】申银万国行业分类标准(2014版).pdf VIP
- 3500个常用汉字整理完整.doc VIP
- 农村狗狗交配的全过程,让你看了有点不可置信.pdf VIP
- 2023——2024学年度第一学期北师大版小学数学一年级上册教学计划附教学进度表.docx VIP
- 新北师大版四年级数学上册第四单元《买文具》课件14.ppt VIP
- 8.2 掌握自驾游计调业务 课件《旅行社计调业务》(中国言实出版社).pptx VIP
- 申银万国行业分类.pdf VIP
文档评论(0)