- 1、本文档共41页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
E2K710ArchitectureforInteroperability全解
Slide Objective: This slide shows a sample architecture for medium sized organisations. Instructor Notes: For smaller sites all roles can be co-located for a single server deployment. As multiple servers are required this is one option for architecture. Mailbox Servers, Hub Transport Client Access Server Roles – Can be co-located, but only the Mailbox Server Role can be installed on a cluster. The mailbox servers can use LCR in this configuration for redundancy, but not CCR or SCC because they are co-located with Hub Transport CAS roles which are not compatible with clustering (TBC) Transport servers provide automatic redundancy within the same site. The Hub Transport Server Role which is co-located on the same server as the Mailbox Server Role will be preferred for that Mailbox Server Role, but if a failover were to occur then the other HT in the site will be utilized. The CAS role will also be preferred for the Mailbox Server Role where it is co-located. For external publishing in this scenario, ISA 2006 with ISA load balancing should be used to provide a single namespace and redundancy between the CAS servers, while maintaining affinity for Push notifications. Edge Servers - are optional, but recommended for mail cleansing (anti-virus, anti-spam, compliance policy application, etc) in the DMZ. The Edge servers can be deployed at any stage, as they don’t require Exchange 2007. Edge cannot be co-located. Is optional independent. Information about scaling mid sized organisations, etc... Exchange 2003 Front-End servers will be replaced by Exchange 2007 Client Access Servers in functionality. Clients will experience the level of functionality determined by their backend server. More details to come. * Slide Objective: This slide does a quick drill down into transitioning from Linkstate Instructor Notes; Routing changes recap By now you’re aware of the basics of E2K7 routing: ? No more routing groups (except for legacy purposes) ?
您可能关注的文档
最近下载
- 新人教版高中生物必修一课本答案整理汇总.pdf VIP
- 2023辽宁高考语文试卷及参考解析(完整).docx VIP
- 专题08 数列求和(奇偶项讨论求和)(典型例题+题型归类练)(解析版).docx VIP
- 2024年危险化学品典型事故案例反思.pptx VIP
- 重难点18 数列中的奇偶项、分段问题(解析版)(5大题型+最新模拟)-备战2025年高考数学重难点专题突破(新高考专用).docx VIP
- 危险化学品典型事故案例反思.pptx VIP
- 《赘婿》测试题带答案.pdf VIP
- 2024年危险化学品典型事故案例反思2025.1.3.pptx VIP
- 2023年软考软件评测师笔记整理.doc VIP
- IPC-A-610J-中文版 CN-2024 TOC 电子组件的可接受性.pdf VIP
文档评论(0)