604 a96 e. m a n h o l e s, i n l e t s, a n d c a t c h b a s i n(604年a96 e . m n h o l e s i n l e t s、n d c a t c h s n)(8页).docVIP

  • 13
  • 0
  • 约1.17万字
  • 约 8页
  • 2017-01-30 发布于湖南
  • 举报

604 a96 e. m a n h o l e s, i n l e t s, a n d c a t c h b a s i n(604年a96 e . m n h o l e s i n l e t s、n d c a t c h s n)(8页).doc

Amend Section 604 - Manholes, Inlets and Catch Basins to read as follows: “SECTION 604  MANHOLES, INLETS AND CATCH BASINS 604.01 Description. This work includes constructing and/or adjusting manholes, inlets, catch basins, and/or standard valve boxes according to the contract. 604.02 Materials. Concrete for structures shall be of the class specified. Concrete shall conform to Section 601  Structural Concrete. If concrete in structures is to come in direct contact with sewage or sewage gases, the Contractor shall modify the proportioning of concrete according to Sectio

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档