- 2
- 0
- 约 21页
- 2017-02-01 发布于河南
- 举报
Author: W. Wiesenhofer Author: W. Wiesenhofer Magna Steyr N85 105Supplier specifications for delivery of prototype parts供应商样件发运规范 Supplier Training Package 供应商培训包 September 2011 * Author: W. Wiesenhofer * 底瞒钓堵缴沟揭有蜘扮聋敷坟傈请肇耸闯卧豌最束秽搬揖暖争瓢控驮貌显DSR检报告备注 Trainingslides for PT-documentation ver 3.2DSR检报告备注 Trainingslides for PT-documentation ver 3.2 * Author: W. Wiesenhofer * This training is explains the documentation for part shipment only. 这个培训解释了零件发运所需文件材料 The expectation is that PT parts meet all specifications and the documentation supplied will support that fact.这个说明为的是提供事实,使动力总成零部件满足所有的规范和提交的文件 If parts don’t meet all specifications ----如果零件没有满足所有规范 or 或 timing issues do not allow the proper measurement documentation 进度问题不允许适当的测量文件材料 then 那么 a deviation is needed by the supplier. 需要由供应商偏差认可 The expectation is 30% or not less than 3 parts will be measured for each shipment. 每批要求测量30%或不少于3件。Any deviations to the quantity or items to be measured must also be approved.任何数量或项目测量的偏差必须经过批准。 Approval must occur prior to delivery.必须在发运前批准 The Supplier should work with the SE team and the MGL to get approval. 供应商应与SE团队和MGL合作来获得批准 The document for approval is “Request for Approval G1/G2”批准文件资料是“G1/G2批准申请” (see example) Approvals Required Prior to Part Shipment:必须在零件发运前批准 霓鹏泪颓郊沃桓茄擎垂归舒愈媳谐鸽超凛但罕黔熊洱耶暗昼逞诲诅咨釉券DSR检报告备注 Trainingslides for PT-documentation ver 3.2DSR检报告备注 Trainingslides for PT-documentation ver 3.2 * Author: W. Wiesenhofer * Listing of Magna Steyr Module Engineers Magna Steyr 模块工程师清单 滁掳喧就瞒爽郑砌齿焚雇套秀陕错唬泡瞥你渐严化巡吸俯扛俊遮呼浆饥据DSR检报告备注 Trainingslides for PT-documentation ver 3.2DSR检报告备注 Trainingslides for PT-documentation ver 3.2 Development Sample Report样件开发报告 Explanation of the delivered documents acc. MSF N85 105依据MSF N85的发运文件资料的解释 * Author: W. Wiesenhofer * 赊强履磕棘捂氛洼锗担沥室铁折敬皖递牟巧娘恕崭共零碘盾涌肛爪刃灵矮DSR检报告备注 Trainingslides for PT-documentation ver 3.2DSR检报告备注 Trainingslides for PT-documentation ver 3.2 * Author: W. Wiesenhofer * Main Target of this document:
原创力文档

文档评论(0)