国华惠州大湾热电厂2

目 录 1、工程概况 2、编制依据···························································3 3、作业前的条件和准备··················································4 3.2作业人员···························································5 3.3作业工机具·························································7 3.4材料和设备·························································8 3.5工序交接··························································13 4、作业程序和方法····················································13 4.1厂区室外消防给水管道安装施工工序·································13 4.2厂区室外生活污水管道安装施工工序·································19 4.3管沟施工······