PMP试题(道)【DOC精选】.doc

  1. 1、本文档共90页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
PMP试题(道)【DOC精选】

PMP试题(435道) 1. Communications is best described as: A. an exchange of information. B. providing written or oral directions. C. consists of senders and receivers D. effective listening. E. All of the above ANS: E   2. Fixed Price contracts place more risk on the: A. owner B. buyer C. seller D. contractor E. C or D ANS: E 3. Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____. A. R D, maintainability, operation and support. B. R D, production, operation and support. C. Acquisition, operations, maintenance. D. Production, operations, maintenance. E. None of the above ANS: B 4. Management By Objectives assumes that the team: A. is receptive to an unstructured environment. B. does not require close supervision. C. possesses a self directed philosophy D. identifies with project objectives. E. All of the above. ANS: E 5. Quality may be defined as: A. conformance to requirements. B. fitness for use. C. continuous improvement of products and services D. appeal to the customer E. All of the above except B ANS: E 6. Since risk is associated with most projects, the best course of action is to: A. cover all project risks by buying appropriate insurance B. ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner. C. avoid projects with clear and present risks D. eliminate all known risks prior to the execution phase of the project E. identify various risks and implement actions to mitigate their potential impact ANS: E 7. The process of choosing/documenting the best approach to achieve the project objectives is part of: A. The scope baseline. B. Scope authorization C. Scope definition D. Scope planning. E. All of the above. ANS: D 8. Time management is the allocation of time in a projects life cycle through the process of: A. Planning B. Estimating. C. Scheduling. D. Controlling E. All of the ab

文档评论(0)

taotao0b + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档