- 1、本文档共161页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
立井井筒施工组织设计.doc
摘要
梁宝寺二号井由肥城矿业集团公司投资兴建,矿址位于山东省嘉祥县,东南距嘉祥县城约20km。LiangBao temple no.2 shaft mining group company of feicheng invested in shandong province, ore addresses from jiaxiang county rizhao-heze expressway, southeast 20km about. Coal mine by international engineering group nanjing design institute design, production capacity of 12,000 Mt/a, Using vertical industrial field, the layout, and three vertical wind.
This design includes three parts: the first part is the basic situation of the construction of coal mining area, including the general situation and the geological exploration and mining, coal mine, the main production systems, industrial square arrangement and ground building, mine construction main technical and economic indexes.
The second part is LiangBao temple no.2 shaft construction organization tram wellbore bedrock, including the building construction preparation: well prepared, engineering technology, supplies and construction work to prepare, foreign cooperation, the surface of the vertical the construction organization design: freeze design (freeze depth, the determination of frozen wall surface), construction, tunneling, vertical section of the bedrock, the construction organization design: vertical bedrock section of the construction scheme, vertical bedrock tunneling (drill-blasting method using construction, including drilling and blasting equipment eye the selection of materials, the blasting parameters and blasting chart, to grasp the rock bolting, made with circular diagram and labor organization), and suspension, suspension system, the arrangement and changeless changeless flat beam structure and checking, hoist and steady vehicles arrangement, construction, auxiliary system safety technical measures, etc.
The third part is the special parts: LiangBao temple no.2 shaft gets grouting technique of main shaft ground, including Wellbore survey controlling,Gets the grouting.
Keywords: field exploit shaft construction drill blasting grouting eyes water.
您可能关注的文档
- 10万头养猪场可行性研究报告书.doc
- 毒重石矿开采环境评估报告表.doc
- 10万头养猪场项目可行性研究报告书.doc
- 10万羽a种鸭养殖繁育产业化项目可行性研究报告.doc
- 房地产项目环境评估报告(优秀环境评估报告).doc
- 12.5万tapan基碳纤维原丝新建项目可行性研究报告书.doc
- 12.1万亩木薯种植建设项目可行性研究报告书.doc
- 14万立方米粉煤灰砌块生产线建设项目可行性研究报告.doc
- 风电塔筒,桨叶项目.doc
- 好又多-成都大业店迁址项目建设可行性研究报告.doc
- 2025中国冶金地质总局所属在京单位高校毕业生招聘23人笔试参考题库附带答案详解.doc
- 2025年01月中国人民大学文学院公开招聘1人笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2024黑龙江省农业投资集团有限公司权属企业市场化选聘10人笔试参考题库附带答案详解.pdf
- 2025汇明光电秋招提前批开启笔试参考题库附带答案详解.pdf
- 2024中国能建葛洲坝集团审计部公开招聘1人笔试参考题库附带答案详解.pdf
- 2024吉林省水工局集团竞聘上岗7人笔试参考题库附带答案详解.pdf
- 2024首发(河北)物流有限公司公开招聘工作人员笔试参考题库附带答案详解.pdf
- 2023国家电投海南公司所属单位社会招聘笔试参考题库附带答案详解.pdf
- 2024湖南怀化会同县供水有限责任公司招聘9人笔试参考题库附带答案详解.pdf
- 2025上海烟草机械有限责任公司招聘22人笔试参考题库附带答案详解.pdf
文档评论(0)