网站大量收购独家精品文档,联系QQ:2885784924

华南理工大学《机械制造技术基础》chapter3-section8-2014.pdfVIP

华南理工大学《机械制造技术基础》chapter3-section8-2014.pdf

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
3.8 The function and design method of process planning file The term process route(工艺规程) refers to the process planning file in which the process and operation method are specified. In another word, the sequence of each operation, the part dimensions, tolerance and technical requirement, technical equipment and measures, cutting parameters, standard production time, and levels of operators’skill are all included in the process planning file. 2015/5/10 SCUT 1 3.8.1 The format of a process sheet工艺过程卡 The format of a part process sheet made by different companies is quite different. In 1982, the pre-mechanical industry ministry(原机械工业部)issued the ministry standard to regulate the format of a part process sheet (referred to JB/Z 1 187.3-82). Nevertheless, operation sheets are largely identical but with minor differences. Usually the following items should be included in a process sheet. Name of product and type ; Name and No . of part ; Raw material ; Name of operation ; Name of plant . 2015/5/10 SCUT 2 In single or small batch type production, only a general and simple process sheet is prepared, shown as the following sample, where the product name and type, part name and drawing No ., the kinds and material of the roughcast, operation No . name and content, the workshop for each operation, equipments and time scheduling are all included 。 2015/5/10 SCUT

您可能关注的文档

文档评论(0)

1243595614 + 关注
实名认证
文档贡献者

文档有任何问题,请私信留言,会第一时间解决。

版权声明书
用户编号:7043023136000000

1亿VIP精品文档

相关文档