目录
1、工程概况 ···················································2
1.1 工程概括 ·················································2
1.2人工挖孔桩概况 ·············································2
1.3工程地质情况 ··············································5
1.4施工要求···················································8
1.5工程施工的特点及难点 ·····································8
1.6 技术保证条件 ············································ 9
2、 编制依据 ················································9
3、 施工计划 ·················································10
3.1 施工进度计划 ·············································10
3.2材料进度计划 ············································10
3.3 主要施工机具计划表 ······································11
4、 施工工艺技术 ············································12
4.1 施工工艺流程 ············································12
4.2 施工方法 ················································13
4.3 检查验收 ················································19
5、 施工安全保证措施 ········································21
5.1 组织保障 ················································21
5.2安全技术措施 ··········································· 22
5.3应急预案 ··············································· 26
5.4监测监控 ·················································30
6、劳动力计划 ···············································31
7、相关图纸 ········································32
7.1 施工现场总平面布置图
7.2 施工进度横道图
7.3部分桩位柱状图
7.4孔桩编号布置平面及排水示意图
7.5孔桩大样图(包括护壁、桩顶护筒、孔桩桩身)
7.6排水沟大样图
1、工程概况
1.1工程概括
*****工程位于龙里县龙山镇贵新联络线东侧。本工程由****房地产开发公司,*****建筑设计有限公司设计,******监理有限责任公司监理,第三建筑工程有限责任公司总承包施工;工程地质由***建筑勘察设计有限公司勘察。
本工程总建筑面积为86829.21m2。结构形式为框架剪力墙结构,-4F+28+1F层,其中地上面积61129.63m2,地下建筑面积30789.05平方。
1.2人工挖孔桩概况
本工程桩基采用人工挖孔桩,7#~9#楼桩总根数为184根,桩身混凝土强度等级为C30,根据地勘资料、设计图纸,孔桩桩径、桩深如下表所示:
栋号 序号 自编桩号 桩径(M)d 按地勘桩长(M) 备注 7#~9#期连接体
1 ZK-270 1.0 15.8 2 ZK-271 1.0 14.8 有溶洞 3 ZK-272 1.0 14.3 4 ZK-273 1.0 15.2 5 ZK-274 1.0 15.7 6 ZK-275 1.0 14.2 7 ZK-276 1.82×1.0(椭圆形孔长边×短边) 14.3 8 ZK-240 1.0 12.8 9 ZK-241 1.0 14.8 10 ZK-242 1
您可能关注的文档
- 第二章_制冷与空调系统安装、维修的主要操作工艺重点.ppt
- 第七单元收集和整理重点.doc
- 电气系14级电工学习题重点.doc
- 逆变器设计整流逆变剖析.ppt
- 逆转裁判2攻略剖析.doc
- 电气系统图处理操作使用说明书重点.doc
- 日本留学见闻重点.docx
- 电气主接线教程重点.ppt
- 第二章1_CPU内部结构重点.ppt
- 电气专业单位工程竣工技术资料文件组成主要目录重点.doc
- 2025年春新北师大版八年级物理下册全册课件.pptx
- 2025年春新北师大版八年级物理下册全册教学课件.pptx
- 2025年秋季新北师大版八年级上册物理全册教学课件.pptx
- 2025年秋季新人教版九年级上册化学全册课件.pptx
- 2025年新人教版八年级上册物理全册课件.pptx
- 2025年秋季新人教版九年级上册化学全册教学课件(新版教材).pptx
- 新人教版七年级上册英语全册课件(2025年新版教材).pptx
- 锂离子电池前驱体磷酸铁合成方法研究现状及展望.docx
- 2024年东盟石油和天然气更新报告(英文版)-东盟.docx
- DB3209_T 1207.2-2022 建设工程档案管理 第二部分:房屋建筑工程文件归档和档案移交范围.docx
文档评论(0)