工程分工表809(家乐福.doc

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程分工表809(家乐福

工程分工表 Duty List (以乙方的施工图作为责任划分依据) (Based on the construction drawings from Party B) 序号 No. 工作描述 Description 甲方工作范围(业主) Party A work scope (LL) 乙方工作范围(家乐福) Part B work scope (C4) 备注及要求 Remarks requirement 结构工程 Structure 总要求 General requirement 设计/采购/施工 Design/ procurement/ construction 设计/采购/施工 Design/ procurement/ construction 根据乙方的工艺平面要求完成结构改造、加固(现存建筑)且载荷满足乙方要求 Structure (existing building) should be remodeled and reinforced per the process and load requirement of Party B 结构梁、柱、墙、楼板、屋面板 Structure beam, pillar, wall, floor slab, and roof slab 设计/采购/施工 Design/ procurement/ construction 设计/采购/施工 Design/ procurement/ construction 荷载须满足乙方对不同区域的荷载要求并出具权威部门的合格检测报告。结构梁、柱、墙、天花打磨或修补,确保乙方在刮白前不再进行打磨及修补,否则甲方完成;收货区楼板、墙面等与室外连通处要施工外墙保温 Structure should match the load requirement of different functional area of Party B, and a testing report should be provided by relevant authoritative agency. The structure beam, pillar, wall, and ceiling should be polished and repaired before the painting works of Party B, otherwise, the painting works should be finished by Party A. The thermal insulation works should be finished for the slabs/ walls between receiving area and exterior 楼板中空部分完成封堵,脚手架拆除完成 The opening of floor slab should be sealed, and relevant scaffold should be removed accordingly. 外(幕)墙、楼梯间墙体、乙方商场与公共区域分隔墙 Exterior (curtain) wall, staircase wall, partition wall between malls of Party B and common area 设计/采购/施工 Design/ procurement/ construction 设计/采购/施工 Design/ procurement/ construction 外墙须按照乙方要求为乙方提供设置标志牌的位置 The signboards’ location on the exterior wall should be provided according to the requirement of party B 货梯、自动扶梯等结构留洞、支撑 Reserved structure opening, support for cargo lifts, autowalker, etc. 设计/采购/施工 Design/ procurement/ construction 设计/采购/施工 Design/ procurement/ construction 根据乙方工艺位置要求 According to the requirements of Party B 人行混凝土(或钢)坡道结构 Concrete (or steel) structure for walking ramp 设计/采购/施工 Design/ procureme

文档评论(0)

1444168621 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档