- 1、本文档共156页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
双鱼大桥下部结构设计_毕设论文
中文题目:双鱼大桥设计
副 标 题:下部结构设计
外文题目:Damage analysis and seismic retrofitting of a continuous prestressed reinforced concrete bridge
毕业设计(论文)共144页 图纸共 13 张
完成日期 2015年6月5日 答辩日期2015年6月17日
摘要,设计车速V=80Km/h。
关键词:
Abstract
The bridge is reinforced prestressed concrete simply supported T beam bridge, the first base and the lower part of the design, in overseas pavement design, bridge a total length of 280m and seven cross, 40m span, load design for highway - grade II load, design speed for V=80Km/h. This part of the design for the design of the substructure of the bridge, including bearing design, beam design, bridge pier (abutment) design, platform design, pile foundation design, the bridge department, Guangzhou City, Guangdong Province, is an important part of Guangzhou citys beltway highway, after the completion of the bridge, new traffic as possible, provide what they ought to do contribution for the economic development of Guangzhou city.
The initial design of the bridge, first access to the lot of the climate, geology, hydrology and other natural materials, and understand the local consumer and industry and trade, and then refer to the laws and regulations, calculation method, design experience and principles, on this basis, combined with the latest regulations and local data, after yourself carefully and seriously, rigorous calculated and checked out. In the design of all parameters, the shape, the size, the method are the laws and rules, with mirror, reflecting the seriousness and standard design.
The design of bearing with the laminated rubber bearings, piers of double column bored pile piers, cap with T shaped cap abutment using wall type frame buried abutment. In the calculation, the calculation and the estimated force of the horizontal force, the vertical force, the pressure of the system, the earth pressure, the earthquake force and so on are considered, and the guarantee for the a
您可能关注的文档
- 生根剂福生活力a型在蔓生天竺葵扦插中的应用_毕设论文.doc
- 生活新报社的发展策略分析_大学论文.doc
- 生物科学 杀菌剂多菌灵对花生、玉米、大豆的药害研究 _毕设论文.doc
- 生生源地信用助学贷款考试_毕设论文.doc
- 生学习拖延行为与时间管理倾向的关系研究_毕设论文.doc
- 生暑期三下乡 调研学术 受教育程度分布及家庭教育决策的影响因素调研_毕设论文.doc
- 声乐演唱中不同唱法的初探_大学论文.doc
- 省老年消费者保健食品消费行为调查分析 场营销专业- _毕设论文.doc
- 省老年消费者保健食品消费行为调查分析 场营销专业 _毕设论文.doc
- 盛丰物流集团福清分公司的仓储管理分析与对策_毕设论文.doc
文档评论(0)