Trackmaster procedure 7 inch High Flow MWD aram.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Trackmaster procedure 7 inch High Flow MWD aram

TRACKMASTER RUNNING, ORIENTATION, SETTING, AND MILLING PROCEDURES These procedures are a guideline and should be used as such; the Operator for SMITH INTERNATIONAL, INC. may have to make adjustments to the final operation. BEFORE RUNNING THE TRACKMASTER Perform a gauge and scraper run. It is recommended that this be done With the following assembly: Make sure that the casing collar depths are known. Bit 6 1/8” OD Scraper Bit sub 10 ft Pony Collar. 2 x 6 1/8” String stabilizers or watermelons. Drill Collars (jars as per client wish) H.W.D.P Note: Alternatively, a drilling assembly (omitting the scraper Mills) utilizing full gauge stabilizers may be used for clean out. This may be prudent in a case where a substantial footage of cement requires drilling out. This assembly closely resembles the stiffness of the Whip stock assembly. The Track master can be set at any depth. The Track master is set hydraulically, so there is no requirement to interact with a cement plug or bridge plug to set the whip stock. As with any whip stock sidetrack, the Track master should be set between 2 casing collars. This is to ensure integrity between the anchoring packer and the milling / and drilling assemblies ORIENTATION OF THE TRACKMASTER MWD and Multi Cycle By Pass Valve will be used. OTHER REQUIREMENTS Ensure mud pump strainers and mud pits clean from any debris. Install ditch magnets. (Protects the pumps from re-circulating steel cuttings) Approximately 15 gallons of hydraulic oil will be required on rig floor to fill up the tools. Trackmaster and Running Tool. The Multi Cycle By Pass Valve should remain open whilst running the Whipstock. Ensure the string is filling when RIH. Never connect the rig pumps to fill the string from surface. Test the MWD MCBPV prior to running

文档评论(0)

l215322 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档