立井井筒施工组织设计_毕业论文
摘要
梁宝寺二号井由肥城矿业集团公司投资兴建,矿址位于山东省嘉祥县,东南距嘉祥县城约20km。LiangBao temple no.2 shaft mining group company of feicheng invested in shandong province, ore addresses from jiaxiang county rizhao-heze expressway, southeast 20km about. Coal mine by international engineering group nanjing design institute design, production capacity of 12,000 Mt/a, Using vertical industrial field, the layout, and three vertical wind.
This design includes three parts: the first part is the basic situation of the construction of coal mining area, including the general situation and the geological exploration and mining, coal mine, the main production systems, industrial square arrangement and ground building, mine construction main technical and economic indexes.
The second part is LiangBao temple no.2 shaft construction organization tram wellbore bedrock, including the building construction preparation: well prepared, engineering technology, supplies and construction work to prepare, foreign cooperation, the surface of the vertical the construction organization design: freeze design (freeze depth, the determination of frozen wall surface), construction, tunneling, vertical section of the bedrock, the construction organization design: vertical bedrock section of the construction scheme, vertical bedrock tunneling (drill-blasting method using construction, including drilling and blasting equipment eye the selection of materials, the blasting parameters and blasting chart, to grasp the rock bolting, made with circular diagram and labor organization), and suspension, suspension system, the arrangement and changeless changeless flat beam structure and checking, hoist and steady vehicles arrangement, construction, auxiliary system safety technical measures, etc.
The third part is the special parts: LiangBao temple no.2 shaft gets grouting technique of main shaft ground, including Wellbore survey controlling,Gets the grouting.
Keywords: field exploit shaft construction drill blasting grouting eyes water.
您可能关注的文档
- 精密薄板有限公司年产25万吨冷轧薄板工程项目技术方案文本设计(109页)_毕业论文.doc
- 景德镇唐英大道左幅路面工程施工组织设计说明书书书_毕业论文.doc
- 静电除尘器本体结构设计_毕业论文.doc
- 九年级数学直角三角形边角关系探究基础题北师版_毕业论文.doc
- 九年级数学直角三角形的边角关系探究(直角三角形边角关系)基础练习_毕业论文.doc
- 精密机械设计课程设计说明书_毕业论文.doc
- 九年级物理上学期期末考试预测卷人教版_毕业论文.doc
- 九年级数学直角三角形中的边角关系(直角三角形中的边角关系)拔高练习_毕业论文.doc
- 九年级一元二次方程综合测试_毕业论文.doc
- 酒店xxxx年度人力资源部工作总结_毕业论文.doc
最近下载
- 精品解析:2025年云南省中考英语真题(解析版).docx VIP
- 2025中国金融市场投资者洞见白皮书.pdf VIP
- 2025年云南省中考英语真题(解析版).doc VIP
- 2025年混凝土质量控制及管理制度(二篇) .pdf VIP
- 北京海淀区2023-2024学年高三上学期期末生物试题 Word版含解析.docx VIP
- 沙漠光伏治沙工程行业可行性分析报告.docx
- 2024云南初中英语中考试卷分析.docx VIP
- 以“政府绩效与公众信任”为主题,撰写一篇小论文.docx VIP
- 2025年艺考生录取分数计算方式.pdf VIP
- 无人驾驶深度之一:无人物流专题:万事具备,爆发元年.pptx VIP
文档评论(0)